Laserfiche WebLink
INSPECTION REPORT 124 Z®y'35 <br /> 0°W I <br /> Date: \-216 <br /> ./147-- <br /> Permit: 61,0 Hat t-00 I <br /> ....tai ly <br /> Contractor: 1 0 DJ. t b (MO <br /> V\ Owner: (C'1OV1W+ ' r1v�- �V <br /> Site Address: I D Li DI Was iletilm Walt <br /> lJ <br /> TYPE OF INSPECTION REQ ESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> El Slab/Conduit El Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Ground'.• ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> wing Gn. ❑Drywall Nailing ❑ Plumbing Final <br /> P lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK El Roof Nailing ❑Rough In/Service Hot Water Tank <br /> I. .4 g drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS <br /> ❑ OK FOR T.C.O. El CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> El UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 011 Ft''Cirg--' Zcz--e, a_te_gt._ <br /> Inspector: Date: !Q. <br /> EIR(4/09) XZ/r/JA7uL uR x IROMon(NS.425/488-11n00 <br />