Laserfiche WebLink
INSPECTION REPORT <br /> /1% .1.171_ <br /> #vb'.; Date t ( ( tk.0 Permit: � ' -©' <br /> , <br /> Contractor: [ i L dY <br /> Owner: ex Y\ CoS N, <br /> Site Address: 1 G1 2 \N CL.. \A`V1,C � V\VCA)co-.. <br /> U <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground Groundwork/Slab Groundwork/Slab <br /> ❑Groundwork ❑Footing ugh In Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑` Gas Pipe Final <br /> f EJ HWT Final <br /> �OTHER OR CONSULTATION: .- l"J _ ip4 ( `c `_ <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED 111❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour noticeot/ required <br /> (/� 4- L.AU 1 it) V/e)5er- <br /> VOIA - of <br /> M e- — ot. 64: ivy <br /> A • i Add .wiil mliV , <br /> AT -T(A)M <br /> Inspector: rI ill° Date: <br /> /71—x_10 <br /> EIR(10/06) DATABAR,INC. <br />