Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 01/02/2015 <br /> Public Works Permit#: PW1501-001 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Building Permit#; <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee$: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BARIL, HOUNG P & JOSEPH D <br /> 9820 18TH AVE W <br /> EVERETT WA 98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00394900000100 SITE ADDRESS: 9820 18TH AVE W <br /> DESCRIPTION OF PROPOSED WORK: <br /> DRIVEWAY <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. As per approved plan dated 1/2/2015 and the public works inspector's direction in the field. <br /> 5. Keep city streets clean at all times during construction. <br /> w <br /> Your Public Works inspector is Cliff Llndman. Please call him at 425-339-7404 for a consultaion prior to begining ["' <br /> construction and thereafter for inspection requests. <br /> C <br /> z <br /> C <br /> C <br /> ( � ACKNOWLEDGEMENT OF CONDITIONS <br /> U�' tle • ( / ; 3 (ZOI `J 1�" The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> 1because of installation and maintenance of the improvement <br /> /7(9-f <br /> or other right-of-way use hereto applied for and further agrees <br /> • <br /> �� <br /> to remove same upon notice from the City and to replace <br /> Approved for Construction Date public property damaged thereby. <br /> • <br /> FINAL INSPECTION Date - zm <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />