My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5709
>
Resolutions
>
Resolution 5709
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 9:48:29 AM
Creation date
1/19/2017 9:48:19 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5709
Date
11/30/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INFORMATION <br /> 1. Puget Sound Energy is the natural gas provider in this area. To initiate new service orders, <br /> please contact Marilyn Davis Westlund at(425)356-7512 at least 90 days prior to the <br /> required in-service date. <br /> Any relocation of existing gas facilities for this development will be at the developer's sole <br /> expense, and requires 90 days minimum notice. Please contact Elaine Babby at(206)224- <br /> 2018 to coordinate relocation requests. <br /> 2. The Snohomish County PUD currently has sufficient capacity to serve the proposed <br /> development. However, the existing District facilities in the local area may require <br /> upgrading. Cost of any work, new or upgrade,to existing facilities that is required to <br /> connect this proposed development to the District electrical system shall be in accordance <br /> with applicable District policy. For information about specific electric service requirements, <br /> please call the District's Everett office at(425) 258-8272 to contact a Customer Engineer. <br /> EXHIBIT # 2-- <br /> PAGE <br /> PAGE >> OEIL <br />
The URL can be used to link to this page
Your browser does not support the video tag.