My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5684
>
Resolutions
>
Resolution 5684
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 11:27:23 AM
Creation date
1/19/2017 11:27:21 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5684
Date
10/5/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
388.112(b). The information set forth in Volume 2 consists of a single- <br /> line electrical diagram. As such, this information relates directly"to the <br /> production, generation, transportation, transmission, or distribution of <br /> energy," 18 C.F.R. § 388.113(c)(1)(i), and concerns matters of security, <br /> public health and safety. See id. § 388.113(c)(2). Accordingly, the PUD <br /> respectfully requests that this information be accorded privileged <br /> treatment as CEII. An original and two (2) copies of this Volume 2 are <br /> submitted. See 18 C.F.R. § 388.112(b)(2)(i). <br /> If you have any questions,please do not hesitate to contact the undersigned. <br /> Respectfully submitted, <br /> Michael A. Swiger <br /> Counsel for Public Utility District No. 1 <br /> of Snohomish County <br /> cc: Kirk Cover, FERC <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.