My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5653
>
Resolutions
>
Resolution 5653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 12:00:44 PM
Creation date
1/19/2017 12:00:17 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
5653
Date
7/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 6 Six-year Transportation Improvement Program <br /> Agency Everett From 2006 to 2011 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information <br /> B. Bridge No. Federal Funding ExpenditureL� Schedule Projects Only <br /> C. Project Title RNV <br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required <br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thru Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2006) (2007) (2008) 6th Type (MM/YY) <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 1 HP 1998(015) 3 phases in project 13 S 2 0 PE 1/1/2002ITCSP 486 134 620 0 <br /> Local RW 12/1/2005 TCSP 800 200 1000 1,000 3,100 EA Jun-06 <br /> Railroad BNSF RR track relocation CN 6/1/2006 TCSP 2,414 686 3.100 1,530 <br /> Safety BNSF Milwaukee Yard,Old NP Main tracks CN 6/12006 DISC 1,000 780 1,780 <br /> Lowell Junction to Pacific Avenue <br /> Remove 3 sets tracks,build 1 adjacent to main line Totals 4,700 1,800 6,500 1000 4,630 <br /> 19 2 2 phases in project 12 S 0 0 PE 1/1/2006 75 75 CE <br /> Local BNSF to do some of the work CN 6/1/2006 STP(S) 475 475 175 300 No <br /> Railroad ,Railroad crossing safety improvements <br /> Safety various locations <br /> various railroad crossings in Everett <br /> Design and construct railroad crossing improvem. Totals 550 550 225 325 <br /> 19 3 1 phase in project 12 P 00 C CN 7/1/2006 120 120 20 20 20 60 <br /> Local P <br /> Safety Roadway Hazard Elimination Projects-city-wide T <br /> Various locations within City limits 0 <br /> Various streets to Various streets <br /> Remove and/or modify roadside hazards Totals 120 120 20 20 20 60 <br /> 19 1 2 phases in project 7 S 0 0 PE 1/1/2006 <br /> Local CN 7/1/2006 6,000 6,000 1,000 1,000 1.000 3,000 <br /> Preserv./ Annual Street Overlay Program <br /> Mainten. Various streets within City limits <br /> Various streets <br /> Resurfacing streets Totals 6,000 6,000 1,000 1,000 1,000 3,000 <br /> 19 2 2 phases In project 6 S 00 0 PE 1/1/2006 <br /> Local CN 5/1/2006 360 360 60 60 60 180 <br /> Preserv./ Sidewalk repair and replacement <br /> Mainten. Various locations within City limits <br /> Various streets to Various streets <br /> Design,construct new and rehab.Existing sidewalks Totals 360 360 60 60 60 180 <br /> 19 3 2 phases in project 12 S 00 0 PE 1/1/2006 <br /> Local CN 5/1/2006 210 210 35 35 35 105 <br /> Preserv./ Pavement Marking Project <br /> Malnten. Various locations within City limits <br /> Various streets to Various streets <br /> Install pavement markings In various locations Totals 210 210 35 35 35 105 <br /> 19 1 3 phases in project 01 P 0.1 C PE 11/1/2006 85 85 85 <br /> Local S CN 6/1/2007 565 565 565 <br /> Street 106th Place SE Improvements G <br /> Constr. 106th Place SE P <br /> 16th Avenue SE to 19th Avenue SE(SR 527) T <br /> Design and construct street&signal improvements W Totals 650 650 85 565 <br /> 19 2 2 phases in project 01 P 0.4 C PE 1/1/2008 AIP 60 15 75 75 <br /> Local P CN 4/1/2009 AIP 500 100 600 600 <br /> Street 3rd Avenue SE Street Improvements T <br /> Constr. 3rd Avenue SE 0 <br /> 92nd Street SE to 95th Street SE _ <br /> Design and construct street improvements Totals 560 115 675 75 600 <br /> 19 3 2 phases in project 05 P 0.28 C PE 7/1/2009 80 80 80 <br /> Local P CN 5/1/2010 500 500 500 <br /> Street Pine Street Improvements T <br /> Constr. Pine Street Improvements 0 <br /> Everett Avenue to Hewitt Avenue <br /> Design and construct street improvements Totals 580 580 580 <br />
The URL can be used to link to this page
Your browser does not support the video tag.