My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5653
>
Resolutions
>
Resolution 5653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 12:00:44 PM
Creation date
1/19/2017 12:00:17 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
5653
Date
7/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 8 Six-year Transportation Improvement Program <br /> Agency Everett From 2006 to 2011 <br /> County No. 31 Hearing Date <br /> City No. 420 Adoption Date <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. Fund Source Information <br /> Expenditure Schedule Projects Only <br /> B. Bridge No. Federal Funding Local Agency <br /> C. Project Title R/W <br /> Func- D. Street/County Road Name or Number Improve Phase Federal Federal State 4th Required <br /> tonal Priority E. Beginning MP or road-Ending MP or road rent Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thnr Envir. Date <br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2006) (2007) (2008) 6th Type (MM/YY) <br /> 1 2 3 4 5 8 7 9 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 1 STPE-EN94(013) 1 phase in project 32 S 0.10 CN 5/1/2007 STP(E) 400 100 500 500 EA No <br /> Local <br /> Non- Riverfront Walkway Overcrossing <br /> Motorized Riverfront Walkway <br /> BNSF Overcrossing at 41st St.Overcrossing <br /> Construct pedestrian overcrossing of BNSF Railway Totals 400 100 500 500 <br /> 19 2 STPE-0420(002) 1 phase in project 32 S 2 P CN 5/1/2007 STP(E) 44 11 55 55 CE <br /> Local O No <br /> Non- Riverfront Walkway Phase I <br /> Motorized Riverfront Walkway <br /> Lenora Street to 41st Street Overcrossing <br /> Construct bicycle-ped path along Snohomish River Totals _ 44 11 55 55 <br /> 19 3 3 phases in project 32 S 0.3 C PE 1/1/2007 200 200 200 <br /> Local P <br /> Non- 41st Street Connector T CN 12/1/2008 1,500 1,500 500 1,000 <br /> Motorized 41st Street condor 0 <br /> Interurban Trail to Riverfront Walkway <br /> Design and construct bike&ped improvements Totals • 1700 1700 200 500 1,000 <br /> 19 4 2 phases in project 32 P 0.3 C PE 4/1/2002 STPE 15 15 30 <br /> Local P CN 8/1/2004 CMAO 40 40 80 CE No <br /> Non- Terminal Avenue Improvements T <br /> Motorized Terminal Avenue 0 <br /> California Street to Bond Street <br /> Design and construct street&ped improvements Totals 55 55 110 <br /> 19 5 3 phases in project 31 S 0.45 C PE 1/1/2006 DISCR 350 100 450 450 CE <br /> Local P PE 5/1/2007 50 40 90 90 Yes <br /> Non- Henry M.Jackson Park Pedestrian Bridge T CN 7/1/2008 1600 560 2160 1160 1,000 <br /> Motorized East Marine View Drive 0 <br /> East Marine View Drive to Snohomish River <br /> Design,cosntruct bike-ped bridge to POE bike path Totals 2000 700 2,700 1,160 1,000 <br /> 19 6 2 phases in project 32 S 0.42 P PE 4/1/2006 70 70 140 140 CE <br /> Local 0 CN 4/1/2007 280 280 560 560 No <br /> Non- Riverside Bus.Pk. Bike/Pedestrian Imprvmt. <br /> Motorized Riverside Bus.Park Trail <br /> East Marine View Drive to Jackson Ped Bridge <br /> Design and construct bicycle-ped.improvements Totals 350 350 700 560 <br /> 19 8 3 phases in project 32 P 0.45 PE 4/1/2007 15 15 15 15 CE <br /> Local No <br /> Non- West Marine View Drive Bike-Ped Separation CN 4/1/2008 135 135 135 135 <br /> Motorized West Marine View Drive(west side) <br /> 22nd Street to California Street Overcrossing <br /> Design,cosntnrct separation for bikes and peds Totals 150 150 150 15 135, <br /> 19 9 2 phases in project 32 P 0.8 PE 4/1/2007 30 30 30 30 CE <br /> Local No <br /> Non- West Marine View Drive Bike-Ped Separation CN 4/1/2008 220 220 220 220 <br /> Motorized West/East Marine View Drive(north side) <br /> Alverson Bridge to North Broadway <br /> Design and construct bicycle-ped.improvements Totals 250 250 250 30 220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.