|
Page 1 Six-year Transportation Improvement Program
<br /> Agency Everett From 2006 to 2011
<br /> County No. 31 Hearing Date
<br /> City No. 420 Adoption Date
<br /> MPO PSRC _ Federal FundingResolution No.
<br /> Project Identification Project Costs in Thousands of Dollars Federally Funded
<br /> A. Federal Aid No. Fund Source Information
<br /> B. Bridge No. Expenditure Sredule Projects Only
<br /> ncy
<br /> C. Project Title R/W
<br /> D. Street/County Road Name or Number Improve- Phase Federal Federal State 4th Required
<br /> Functional Priority E. Beginning MP or road-Ending MP or road ment Total Utility Project Start Fund Cost by Fund State Local Total 1st 2nd 3rd thni Envir. Date
<br /> Class Number F. Describe Work to be Done Type Status Length Codes Phase (mm/dd/yy) Code Phase Code Funds Funds Funds (2006) (2007) (2008) 6th Type (MM/YY)
<br /> 1 2 3 4 56 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
<br /> 11 1 3 phases in project 4 S ., 5.6 0 PE 1/1/1999 18,300 18,300 7,000 3,000
<br /> Interstate various - RW 11/1/2004 20,000 20,000 5,000 5,000
<br /> I-5 Median HOV Lanes and Auxiliary Lanes CN 5/1/2005 WSDOT 191,700 191,700 30,000 50,000 70,000
<br /> IS
<br /> SR 529(N.Broadway)to E.Marine View Drive
<br /> Design and construct Median HOV and GP aux.lanes Totals 230,000 230,000 42,000 58,000 70,000 0
<br /> 11 2 3 phases in project 3 S 0.1 0 PE 7/1/2003 Disc. 1,000 WSDOT 4,400 500 5,900 2,000 2.000
<br /> Interstate 5/630 P RW 1/1/2006 200 200 200 EA 11/1/2006
<br /> 1-5/41st Street SE Interchange T CN 1/1/2007 STP-U 2,444 WSDOT 36,000 38,444 21,622 21,622
<br /> 1-5,41st Street CN Disc. 4,800 4,800
<br /> IS at 41st Street to 1-5 at 41st Street 0
<br /> Design and construct Interchange Improvements Totals 8,244 40,400 700 49,344 2,200 23,622 21,622 0
<br /> 11 3 3 phases In project 3 S 0.1 0 PE 1/1/2002 1,214 252
<br /> Interstate 5/620 (Sound Transit is lead on project) P RW 7/1/2005 427 205 EA 6/1/2005
<br /> I-5/112th St.Direct Access HOV-P&R/Flyer Stop T CN 7/1/2006 STP-U 2.385 7,969 9,201 750
<br /> 15,112th Street SE 19,268 19,268
<br /> I-5/112th Street SE to I-5/112th Street SE
<br /> Design/Construct HOV Ramps,P&R Lot,Flyer Stop Totals 19,268 19,268 1,641 8,426 8,451 750
<br /> 11 4 3 phases in project 3 P 1.1 0 PE 1/1/2008 RTID 7,842 7,842 2,536 5,306
<br /> Interstate RW 6/1/2010 RTID 2,521 2.521 2,521
<br /> 1-5/Downtown Everett Interchange Improvements CN 9/1/2011 RTID 34,129 34,129 12,605
<br /> IS at Pacific,Hewitt,Everett Avenues
<br /> Pacific Avenue to Everett Avenue
<br /> Major reconfiguration of IS offramps for Downtown Totals 44,492 44,492 2,536 20,432
<br /> 11 5 3 phases in project 1 P 0.1 0 PE 7/1/2009 RTID 4,560 4,560 4,560
<br /> Interstate RW 1/1/2010 RTID 3,990 3,990 3.990
<br /> I-5/100th Street SE HOV Access/Undercrossing CN 1/1/2011 RTID 48.450 48,450 20,000
<br /> I-5,100th Street SE
<br /> SR 527 to South Everett Transit Center area
<br /> Design and construct HOV access/undercrossing Totals 57,000 57,000 28,550
<br /> 11 6 3 phases in project 31 P PE 7/12009 RTID 1,200 1,200 1,200
<br /> Interstate 5/099 RW 1/1/2010 RTID
<br /> I-5/Everett Mall Way Onramp CN 1/1/2012 RTID 10.800 10,800
<br /> NB Everett Mall Way to SB IS
<br /> NB Everett Mall Way to SB 1-5
<br /> Design and construct Interstate Onramp Totals 12,000 12,000 1,200
<br /> 11 7 3 phases in project 1 P 0.3 0 PE 1/1/2009 WSDOT 1,000 1,000 2,000 2,000
<br /> Interstate RW 6/1/2010 WSDOT 1,000 2,000 3,000 3,000
<br /> 1-5/Smith Island Freeway Interchange CN 7/1/2011 WSDOT 8,000 12,000 20,000 5,000
<br /> IS at 12th St.NE or other location on Smith Island
<br /> 12th St NE,or other location north of 12th St.NE
<br /> Design and construct freeway interchange Totals 10,000 15,000 25,000 10,000
<br />
|