Laserfiche WebLink
Run.rate: 11/13/03 City of Everett-Public Works Department Cutoff Date; 10/24/03 <br /> Time: 9:19 AM Contract Estimate Voucher <br /> • <br /> Project: 159 For Work Order#3137 Contractor: SIGNAL ELECTRIC,INC. <br /> Broadway&Wall St.Traffic Signal Estimate#6 P.O.BOX 6209 <br /> WO 3137 BID:$163,672.00 • KENT,WA 98064-6209 <br /> TOTAL BID:$163,672.00 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 7,000.00 1.00 1.0000 1.0000 0.0000 7,000.00 7,000.00 0.00 <br /> 0002 Surveying LS 6,000.00 1.00 1.0000 . 1.0000 0.0000 6,000.00 6,000.00 0.00 <br /> 0003 Maintenance&Protec tion of Traffic Control LS 4,500.00 1.00 1.0000 1.0000 0.0000 4,500.00 4,500.00 0.00 <br /> 0004 Traffic Control Labor HR 40.00 480.00 59.5000 43.5000 16.0000 2,380.00 1,740.00 640.00 <br /> 0005 Contruct Traffic Signal Brdwy @ Wall St. LS 77,399.00 1.00 1.0000 1.0000 0.0000 77,399.00 77,399.00 0.00 <br /> 0006 Illumination Syst.Ev.Spec.Events Ctr LS 35,095.00 1.00 1.0000 1.0000 0.0000 35,095.00 35,095.00 0.00 <br /> 0007 Construct Signal detect.Imps;Rucker @ Wall LS 6,889.00 1.00 1.0000 1.0000 0.0000 6,889.00 6,889.00 0.00 <br /> 0008 Existing private restoration improvement FA 1,00 3,000.00 7,695.3500 2,272.0100 5,423.3400 7,695.35 2,272.01 5,423.34 <br /> 0009 24"Plastic Cross walk Line LF 3.75 660.00 640.0000 640.0000 0.0000 2,400.00 2,400.00 0.00 <br /> 0010 24"Plastic Stop Bar Line LF 3.75 140.00 141.0000 141.0000 0.0000 528.75 528.75 0.00 <br /> 0011 8"Wide Line Plastic LF 2.14 100.00 100.0000 100.0000 0.0000 214.00 Q14.00 0.00 <br /> 0012 Plastic Traffic Arrow EA 107.00 2.00 2.0000 2.0000 0.0000 214.00 214.00 0.00 <br /> 0013 Paint Line LF 0.43 2,700.00 1,020.0000 1,020.0000 0.0000 438.60 438.60 0.00 <br /> 0014 MOH LS 1.00 3,873.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> Work Order Totals: 150,753.70 144,690.36 6,063.34 <br /> • <br /> -J <br /> N <br />