5 <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Change Order No. 1 with Wilder Construction for the Initialed by: <br /> Evergreen Way Improvements,41'St. to 47th St. Depai tttrent Head 's J <br /> Project in the amount of$ 751,168.37. CAA <br /> Council President gee, <br /> LOCATION: <br /> COUNCIL BILL# <br /> Evergreen Way,41St to 47th Originating Department Public Works <br /> Contact Person Terry Henke. � <br /> Phone Number 275-8928 <br /> FOR AGENDA OF Dec. 31,2003 <br /> Preceding Action: <br /> Bid: 4/29/03 X Consent Second Reading <br /> Award: 5/14/03 Action Third Reading <br /> First Reading Public Hearing <br /> Budget Revision <br /> Attachments: Department(s) Approval (Identify): Public Works <br /> Change Order No. 1 <br /> 2ouncil approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ 2,228,845.87 Account Number(s): 2981 <br /> Amount Budgeted $ 1,477,677.50 <br /> Additional Required $ 751,168.37 <br /> SUMMARY STATEMENT: Change Order No. 1 with Wilder Construction for the Evergreen Way Improvements, 41St St. to 47th <br /> St. project was written in the amount of $751,168.37 to cover the cost of additions to the contract. The major cause of the <br /> additional cost was the discovery of ground water seepage adjoining the large retaining wall at the south end of the project. The <br /> groundwater was not discovered in the initial geotechnical investigation, even though 5 test pits were dug. The groundwater <br /> indicated a greater chance of a landslide that could cause property damage and jeopardize workmen safety. Work on the wall was <br /> suspended while a new wall type was designed which required a more costly method of construction. Additional cost overruns <br /> included private property restoration, added asphalt for overlaying and leveling the roadway, traffic control and motorist message <br /> signs, and the contractor's administrative cost for the additional working days needed to construct the new wall. Due to the size of <br /> this change order Perteet Engineering was hired to perform an in-depth item by item review. They concluded that the unit costs for <br /> the additional work were within the prevailing rates, and the extra work was required to complete the project. <br /> The funding sources for this change order are: TIB (State)Grant $150,249.00 <br /> Fund 119—Street Improvements $135,241.00 <br /> Fund 157—Traffic mitigation $300,678.37 <br /> Fund 301 —Arterial Streets $165,000.00 <br /> Total $751,168.37. <br /> • <br /> 9 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order No. 1 with Wilder Construction for the Evergreen Way Improvements,415t St. to 47th <br /> St. Project in the amount of$ 751,168.37. <br />