My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/09/24 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/09/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 11:06:02 AM
Creation date
1/20/2017 11:04:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/24/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> Project:California Street Overcrossing Project <br /> Change Order No.4 <br /> Change Order Effective Date:August 8,2003 <br /> Item#112-Metal Edging. Add additional linear feet of metal edging to the contract. <br /> Item#119-Cement Concrete Curb&Gutter,Type A-1. Delete linear feet of cement concrete curb and <br /> gutter,Type A-1,from the contract. <br /> Item#120-Paint Stripe. Delete linear feet of paint stripe from the contract. <br /> Item#121 -Plastic Gore Stripe. Add additional linear feet of plastic gore stripe to the contract. <br /> Item#122-24-Inch Plastic Crosswalk Stripe. Delete linear feet of 24-inch plastic crosswalk stripe from <br /> the contract. <br /> Item#123-Plastic Stop Bar. Add additional linear feet of plastic stop bar to the contract. <br /> Item#126-Raised Pavement Markers,Typel. Delete hundred count raised pavement markers,Type 1, <br /> from the contract. <br /> Item#127-Raised Pavement Markers,Type2. Add additional hundred count raised pavement markers, <br /> Type 2,to the contract. <br /> Item#132-Telemetry Cable,6 Pair. Delete linear feet of telemetry cable,6 pair,from the contract. <br /> Item#133-Telemetry Cable,25 Pair. Delete linear feet of telemetry cable,25 pair,from the contract <br /> Item#136-Traffic Control Labor. Delete hours of traffic control labor from the contract. <br /> Item#140-Chain Link Fence,Type 3. Delete linear feet of chain link fence,Type 3,from the contract. <br /> Item#141 -End,Corner and Pull Post for Chain Link Fence. Delete each of end,corner and pull posts <br /> for chain link fence from the contract. <br /> Item#146-Training. Add additional hours of training to the contract. <br /> Item#147-Roadside Cleanup. Delete percentage of lump sum for roadside cleanup from the contract. <br /> Item#150-Street Cleaning. Delete hours of street cleaning from the contract. <br /> Item#151 -Minor Change. Add additional percentage based on Extra Work Orders to the contract. <br /> Item#153-Contaminated Material Disposal. Add additional force account for contaminated material <br /> disposal to the contract. <br /> Item#154-Concrete Class 4000W for Bridge. Delete cubic yards of concrete,Class 4000W,for bridge <br /> from the contract. <br /> Item#155-Concrete Curb,Foundation Mat. Delete linear feet of concrete curb on the foundation mat <br /> from the contract. <br /> Item#156-Pile Splice. Delete each of pile splices from the contract. <br /> Item#157-Overexcavation,Unsuitable Material. Add additional cubic yards of overexcavation of <br /> unsuitable material to the contract. <br /> Item#158-Ductile Iron Combined Sewer Pipe,8-Inch. Delete linear feet of ductile iron combined <br /> sewer pipe, 8-inch,from the contract. <br /> Item#159-Ductile Iron Sanitary Sewer Pipe,8-Inch. Delete linear feet of ductile iron sanitary sewer <br /> pipe,8-inch,from the contract. <br /> Item#164-Concrete Inlets. Delete each concrete inlets from the contract. <br /> Item#165-18"Flared End Section. Delete 18"flared end section from the contract. <br /> Item#166-6"Ductile Iron Sanitary Sewer Pipe. Delete linear feet of 6"ductile iron sanitary sewer pipe <br /> from the contract. <br /> Item#169-Bioswale Excavation and Grading. Add additional cubic yards of bioswale excavation and <br /> grading to the contract. <br /> Item#173-Curb Inlets. Add additional curb inlets to the contract. <br /> Item#174-8"Ductile Iron Storm Sewer Pipe. Delete linear feet of 8"ductile iron storm sewer pipe <br /> from the contract. <br /> Work Order 2923 B <br /> Item# l -Sanitary Sewer Pipe,24"Diameter. Delete linear feet of sanitary sewer pipe,24"diameter, <br /> from the contract. <br /> Item#2-Ductile Iron Sanitary Sewer Pipe,36"Diameter. Delete linear feet of ductile iron sanitary <br /> sewer pipe,36"diameter,from the contract. <br /> Exhibit A <br /> Page 6of11 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.