My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003/10/29 Council Agenda Packet
>
Council Agenda Packets
>
2003
>
2003/10/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 11:17:09 AM
Creation date
1/20/2017 11:16:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/29/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> PUBLIC WORKS TRUST FUND <br /> Pre-Construction Program <br /> ATTACHMENT 1: SCOPE OF WORK <br /> PW-03-691-PRE-117 <br /> EVERETT <br /> Phase 6 Replacement Transmission Lines Nos.2 and 3 <br /> 1. Provide a clear description of the project to be financed in part by a Public Works <br /> Trust Fund loan. (Attach additional sheets if necessary): <br /> The project involves the design and preparation of bid documents for the replacement <br /> of approximately 3,800 lineal ft. of 48-inch diameter pile supported pipe for both <br /> Transmission Lines No. 2 and No. 3 (approximately 7,600 feet total). The pipelines <br /> are located between a point approximately 750 feet east of the Snohomish River to a <br /> point on the west side of Home Acres Road. The pipelines will be replaced with <br /> similarly sized pipes. The scope for this project also includes environmental studies, <br /> geotechnical investigations, permitting, and wetland mitigation. <br /> 2. The term of this loan will be twenty years. <br /> • <br /> 36 <br /> T_\Contracting\Pre-Con\PC Scope 03 PRE 117.dot <br />
The URL can be used to link to this page
Your browser does not support the video tag.