Laserfiche WebLink
everett INSPECTI�IN REPORT <br /> eAddress �-�1�.�— <br /> Contractor _ �� �. <br /> Owner ��Q�1.,2� <br /> Date �—�n� � <br /> TYPE OF INSPECTION RE�UESTED <br /> ❑ BIDG: Pmt. No. Cl MEChI: Pmt. No. <br /> ❑ ELEC: Pmt. Wo �PLE3G: Pmt. No. � <br /> ❑Temp. Elect. ❑Framing ❑ Ges Piping <br /> ❑ Footing ❑Drywell, Nailing ❑Consalletlon <br /> ❑ Fnundetion C Shear Nailing �t'uaundwork ' <br /> ❑ Ductwork ❑Grid ❑ Struct.Slab <br /> ❑Wood Stove ❑Rough•In ❑ Finel <br /> son ❑ Service ❑ <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ CORRECTION REQUIRED <br /> ❑ Correctlons Iisled below MUST Bc MADE beforn work cen be epproved. <br /> ❑ Pleese contact Inspector and eirange for appointment. <br /> ❑Was nof able to peAorm inspectlon. <br /> ❑ CAI.L 269•8810 FOH REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREh11SES PIIIOII TO OCCUPANCY. <br /> J <br /> o � <br /> Inspector Date <br />