Laserfiche WebLink
I ��. �.� <br /> �� <br /> FRANKLIN <br /> ENGINEERING <br /> o���mhe� 2, 2oos <br /> ENVELOPE SUMMARY <br /> RE: Columbia Distribution <br /> 6611 Associated Blvd <br /> Everett, VVA 98203 <br /> Tenant Improvement of existing Warehouse to conditioned Office space. Project complies <br /> with 2006 WSEC usiny the Component Pertormance approach witn heating by Other <br /> Fuels. <br /> Vertical Glazing (Exteriorl: Double pane, 1 /2" space Air, low-e '"'01 {ixed. Or certified <br /> tested assembly per NFRC. U =0.55, default (Table 10-61. SHGC =0.45. <br /> Vertical Glazing (Relitesl: Double pane, any size airspace. U =0.90, default (Table 10-61. <br /> SFIGC =exempt. <br /> Doors (Opaque�: Wood, U = 0.50, default (Tabl� 10-61. <br /> Other Roof: R-19 rigid insulation plus recovery board. U =0.046, calculated. <br /> Wall tl1 (Opaque, Exterior, Floor to 9'•0" AFF►: Concrete, min. 6" thick, furred with metal <br /> swds, 3-t !2", 24" uc with R-1 � batt insulation, U =0.101 , calculated. <br /> Wall #2 (Opaque, Exterior, 9'•0" AFF to Structure Abovel: Concrete, min. 6" thick, with <br /> R 19 batt insulation stickpinned to concrete, U =0.053 r.alculated. <br /> Wall #3 (Opaque, Warehouse at First Floorl: Wood studs, 2x6, 16" oc with R-13 batt <br /> insulation, U =0.062 default ITable 10-51. <br /> Wall #4 (Opaque, Warehouse at Second Floorl: Metal studs, min. 5-1/2", 24" oc with R- <br /> 19 batt insulation, U =0.G94 drfault ITable 10-5A1. <br /> ; 9�i� � <br /> �� <br />