Laserfiche WebLink
� �� <br /> I �o <br /> �� <br /> FRANKLIN <br /> ENGINEERING <br /> �a�� iz ciU <br /> December 2, 2008 <br /> ENVELOPE SUMMARY <br /> RE: Columbia Distribuuon <br /> 6611 Associated Bl�d <br /> Everett, WA 98203 <br /> Tenant Improvement of existing Warehouse ta conditioned Office space. Project complies <br /> wrth 2006 WSEC usiny the Component Performance approach with heating by Other <br /> Fuels. <br /> Vertical Glazing (Exteriorl: Double pane, 1 /2" space Air, low-e 'p1d1, fixed. Or certi(ied <br /> tesled assembly per NFRC. U = 0.55, default ITable 10-61. SHGC =U.45. <br /> Vertical G�azing (Relites�: Double pane, an� size airspaa�. U =0.90, default (Table 10-6). <br /> SHGC = exempt. <br /> Doors (Op,yuel: V�'�od. U - 0.50, de(r,ult ITable 10-61. <br /> Other Roof: R-19 rigio insulation plus recovery board. U - 0.046, calculated. <br /> Wall Jt1 (Gpaque, Exterior, Floor to 9'-0" AFF1: Concrete, min. 6" thick, furred with metal <br /> studs, 3-1-2", 24" oc with R-15 batt insulation, U =C.101 , calculated. <br /> Wall tt2 (Opaque, Exterior, 9'-0" AFF to Structure Above►: Concrete, rc�in. 6" thick, with <br /> R-19 batt insulation stickpinned to concrete, U =C1.053 calculated. <br /> Wall #3 (Opaque, Warehouse at First Floorl: Wood studs, 2x6, 16" oc with R-19 batt <br /> insul�tion, U = 0.062 default ITable 10-51. <br /> Wall t14 (Opaque, Warehouse at Second Floorl: Metal studs, min. 5� 1 i2", 24" oc with R- <br /> 19 batt insulation, U = 0.094 default ITable 10-5A1. <br /> // <br />