My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004/09/15 Council Agenda Packet
>
Council Agenda Packets
>
2004
>
2004/09/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 10:35:29 AM
Creation date
1/23/2017 10:35:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/15/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> • PROJECT TITLE: <br /> Authorization to Sign Amendment X Consent COUNCIL BILL# <br /> No. 1. Agreement with Northwest Action Originating Department Public Works <br /> Corrosion Engineering for the First Reading Contact Person Vincent Rhinehart V It <br /> Transmission Line #2- Phase 8A Second Reading Phone Number 257-8887 <br /> project. Third Reading FOR AGENDA OF Sep. 15,2004 <br /> Public Hearing <br /> Initialed by: <br /> Department H ad - l ryt'' <br /> CAA <br /> Council Presiden <br /> Location Preceding Action Attachments Department(s) Approval <br /> South of 20th St S.E., Council authorized Amendment No. 1 (two Legal <br /> SR9 to Lake Stevens Mayor to sign original copies) signed by <br /> Road) _ Contract consultant <br /> Council approval of this agenda item authorizes a budget revision in the additional amount requested. <br /> Expenditure Required $ -0- Account Number(s): <br /> Amount Budgeted $ 100, 000.00 UP 3183 - 1 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Amendment No. 1 to the Professional Services Agreement with Northwest Corrosion Engineering extends <br /> the completion date of the contract from March 8, 2004 to June 30, 2005 to allow for the completion of the <br /> construction phase of the Transmission Line No. 2 —Phase 8A Replacement project. This Amendment does <br /> not change the dollar amount or Scope of Services of the Professional Services Agreement. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the mayor to sign Amendment No. 1 with Northwest Corrosion Engineering, Inc. to provide <br /> corrosion protection engineering services to the City of Everett for the Transmission Line No. 2— Phase 8A <br /> Replacement project. <br /> 19 <br /> DEDIIRHINEHARTl712 City Council Agenda NW Corrosion Engr Arrarendrrent <br />
The URL can be used to link to this page
Your browser does not support the video tag.