Laserfiche WebLink
Itl:: P:osrUoni I)c�rlopmcntIIuildings:+*'..wCommcrcial Pagc I of2 <br /> Meg Haley -- - --- <br /> From: Meg Haley D L�iJ lp - C `�� <br /> Sent: Friday, July 06, 2007 3:01 PM <br /> To: Dave Tyler <br /> SubJecL• RE: Panattoni Development Buildings: A& B Mounlain View Business Center <br /> That looks great Dave Thanks! -Meg <br /> From: Dave Tyier <br /> Sent: Friday, ]uly 06, 2007 12:31 PM <br /> To: Meg Haley <br /> Subjed: RE: Panattoni Development Buildings: A & B Mountain View Business Center <br /> Meg- <br /> I did some wordsmithmg and came up with this. which would be noted as a conddion on the final BSP map <br /> "A 30-foot no-build easement must be provided from the lot line on both Lots 1 and 2. The purpose of this <br /> requirement is to allow new construction of each separate L•uilding (A & B) with a consistent zero hour fire- <br /> resistance rating at the exterior wall, based on a 30 foot minimum fire separation distance from the property <br /> line, per Table 602 in the 2003 International Building Code." The no-build easement ,hall also be shown <br /> graphically as depicted on the preliminary binding site plan map. <br /> From: Meg Haley <br /> Sent; friday, )uly 06, 2007 10:56 AM <br /> To: Dave Tyler <br /> Subfect: Panattoni Development Buildings: A& B Mountain View Business Center <br /> Dave, <br /> The customer nas requested Ihat each of the two bwldings(A 8 B) be considered separate buildings, refernng to the no-build <br /> easemenl between the buildings as parl of the binding site plan approval, see e-mad below from lhe Architect John Llacuna <br /> The Public Services/Permit Services Department would hke the binding sde plan to include, as a conAition of approval, a 30 foot <br /> no-build easement tor each separate lot(1 & 2) from lhe property Ime between lots crealed by lhe binding site plan. This binding <br /> condition on each lot allows the new consVuction of each separate building (A 8 B) with a consislent zero hour fire- <br /> resistance ra6ng at the extenor wall, based on a 30 (oot minimum fire separat�on distance from the property fine, per Table 602 m <br /> the 2003 Intemalional Bwlding Code <br /> Thanks. <br /> -Meg <br /> _ ____ --- ---- __ <br /> From: John Llacuna [mailto:john.11acuna�asynthesispc.com] <br /> Sent: Thursday, July O5, 2007 5:01 PM <br /> To: Mee Haley <br /> Subject: RE: Panattoni Development Buildings: New Commercial <br /> Hi Meg. <br /> In regards to Item #2. unlimited area. we would prefer to count buildmgs A and B as lwo buildings. <br /> A 60' wide no-budd easement between the buildings has been recorded with the Binding Site Plan See attached Sheet A1.0. <br /> y�- <br /> �i�n��no� <br />