Laserfiche WebLink
� <br /> ! <br /> i <br /> (scc l�igurc 1 - Do�lnstrcam Druinagc Basin Map). Thc six-month storm flow ratc was � <br /> calculatcd using thc Santa Barbar� Urban llydrograph mcthod and Aic StortnSHEDT�� computcr � <br /> program. Runoff greatcr than thc six-month storm w�ill bypass the StormFilter� structures and <br /> disr,hargc dircctly t� thc cxisting slorm systcm along Associatcd Boulevard. RunoCf from ihc � <br /> building rooPbypasscs the filter swctures. Thc roof will be constructcd of mattrial that is not of � <br /> a pollution-gcncrating material. <br /> The StormPiltcr� rnust he maintaincd according to City of E��crett requirements and the <br /> manufacturer's maintenance manual. Thc maintcnance manual is induded as Appendix C. <br /> A ccrli.ficatc of mai�ricnancc perfornicd must bc suhmitted to ihc City of Gecrctt annually. <br /> Off-site Runoff Design <br /> No offsitc slomiwatcr cnlc�s lhc propert��. <br /> �if�27(16�IIIS:scpur�shmlding b hydruuhts rcpan.duc.���a�-mad <br /> Panatloni Developmenl LLC Building B , i�--� <br /> Hydraulice Re, ��' .�. ,� � <br />