Laserfiche WebLink
3. Open the doors to ihe vault and allow Replacement cartridges will be delivered to <br /> the system to air out for 5-10 minutes. ihe site. Information conceming how to <br /> obtain the replacement caAridges is <br /> 4. Without entering the vault, inspect the available from CONTECH Stormwater <br /> inside of lhe unit, including components. Solutions. <br /> 5. Take notes about the external and Warning: In the case of a spill, the worlcer <br /> internal condition of the vault. should abort maintenance activities until <br /> the proper guidance is obtained. Notify the <br /> Be sure to record the leval of sediment local hazard control agency and <br /> build•up on the (loor of the vault, in the CONTECH Stormw�ler Solutions <br /> forebay, and on top of the cartridges. If immediately. <br /> flow is occurring, note the level of water <br /> and ostimate the flow rate per drainage To conduct cartridge replacement and <br /> pipe. Rec�rd ali observations. sediment removal maintenance: <br /> G. Remove large loose debris and trash 1. Ii applicable, set up safety equipment to <br /> using a pole with a grapple or net on the protect pedestrians from fall hazards <br /> end. due to open vault doors or when work is <br /> being done near walkways or roadways. <br /> 7. Close and fasten the door. <br /> 2. Visualiy inspoct the extemal condition o( <br /> 8. Remove sa(ety equipment. tha unit and take notes conceming <br /> deteci�iproblems. <br /> 9. Make notes about the local drainage <br /> area re!ative to ongoing construction, 3. Open the doors to the vault and allow <br /> erosion problems, or high loading of the system to air out for 5-10 minutes. <br /> other materia!s to the system. <br /> 4. Wilhout entering the vault, give the <br /> 10. Finally, review the condition reports from inside of the unit, including components, <br /> the previous minor and major a general condition inspection. <br /> maintenance visits, and schedule <br /> caAridge replacement if needed. 5. Make notes about the external and <br /> intemal condition of the vault. <br /> Major Maintenance <br /> Give particular attention to recording the <br /> Depending on the contiguration of the level of sediment build-up on the floor of <br /> particular system, a worker may be required the vault, in the (orebay, and on top of <br /> to crrter the vault to perform some tasks. the intemal components. <br /> Important: If vault entry is required, OSHA 6. Remove large loose debns and trash <br /> rules for conlined space entry must be using a pole with a grapple or net on the <br /> followed. end. <br /> Filter cartridge replacement should occur 7. Using a boom, crane, or other device <br /> during dry weather. It may be necessary to (dolly and ramp), offload the <br /> plug the lilter inlet pipe if base flows exist. replacement cartridges (up to 150 Ibs. <br /> Standing water preseN in ihe vault should each) and set aside. <br /> be regarded as polluted and should be 8. Remove usr.d cartridges from the vault <br /> contained during this operation by using one oi the tollowing methods: <br /> temporarity capping the manifold <br /> connectors. <br /> J[70�i f.,lN1! GH Slormwmer Salu6ons 7nlblree 800 54P 4667 5 019 <br /> � � n ,. �.eati�r co�•� l'AeR CIP i•�t]t�npnr SlarmPJlc�OpFl�aliUn pnd M3minnaixB Gu�4N�tw5 <br />