My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2114 BAKER AVE 2018-01-02 MF Import
>
Address Records
>
BAKER AVE
>
2114
>
2114 BAKER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 1:20:49 PM
Creation date
1/23/2017 11:16:03 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2114
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' l 1 <br /> PUBLIC WORKS PERMIT COh7MENTS <br /> 4. Connect side sewer per City Standard#601. <br /> � Connecl side sewer per Cily Slandard#'s 601, 602, 604. <br /> 6. Connecl all rooftop downspouts lo the side sewer. <br /> 7. Connect rooftop downspouts to Ihe drainage system provided for this lot. <br /> � Rooftop runoff must be discharged to a roof downspout Infiltration system per City of Everett Stortn <br /> Manual 3-2.6.2. The approximale size trench is 3.5'wide, 2'deep and 25'long. See attachment for <br /> more details. <br /> � The coniractor must meel with the Public Works li�sp�ctor to discuss potential dra(naga routing prior to <br /> beginning lhe proJect. <br /> 10. Install erosion conlrol measures as determined by Ihe Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion btankets. <br /> 11. Inslall erosion conirol measures per City of Evei all Slandards(or small parcets <br /> 92 Remove erosion conlrol measures upon completion of the proJect prlor to final approval of the permil. <br /> 13. All excavated materlal from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of materlal is altowed on fhis building lot. <br /> � No dirt, mud, rocks or debris to be trecked onto roadway. <br /> 15 No building materials to be stacked on sidewalks and sidewaiks to be kept clean and o�en for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewatk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A& 306 on <br /> lhis proposal's frontage as directed by the Public Works Inspector(f.o. all unused dr(veways and any <br /> broken or damaged area musl be replaced). <br /> 18. Install a Ty,�e I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway trom the front property line out lo lhe street paving. <br /> 20. Contact the Water District for connecting provisions for ihis building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 wilh a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, ihe pressure Iine must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system is required for ihis building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> ; � <br /> PWCommen4a . � .. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.