My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2114 BAKER AVE 2018-01-02 MF Import
>
Address Records
>
BAKER AVE
>
2114
>
2114 BAKER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2020 1:20:49 PM
Creation date
1/23/2017 11:16:03 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2114
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( (. <br /> PllBLIC V`.�ORKS PERMIT COMMENTS <br /> 4. Connect side sewer par Cih�Standard #601. ' <br /> � Connect side sewer per City Standard #'s 601,602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. i <br /> 7 Coni iect iooftop downspouts lo the drainage system provided for this lot. <br /> 8. Rooftup runoH must be discharged lo a roaf downspout infiliration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trenc:h is 3.5'wide, 2'deep and 25' long. See aNachment for <br /> more details. <br /> __ � The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Randv Allen at 425-339-7403 /I Call Cliff Lindman at 425339-7404. <br /> �— 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, slraw <br /> bales,swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> �. 12 Remove erosion control measures upon completion of the project prior to final approval of ihe permit. <br /> � All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this buiiding lot. <br />� 14 No dirt, mud,rocks or debris to be iracked onto roadway. <br /> � � No building materials to be stacked on sidewalk/roadway and sidewalklroadway to be kept clean and <br /> open for pedestrian travel. <br /> Adjust water meter box 1" above sidewalk grade. <br /> Remove and replace curb, gutter and sidewalk as per City o(Everett Standard Nlan#'s 305A&306 on <br /> this proposal's frontage as directed by the Public Works Inspeclor(i.e. all unused driveways and any <br /> broken or damaged area rnust be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 79. Pave clriveway from the front property line out to the street paving. <br /> � 20. Pave to existing paving in alley. <br /> 27. Contact the Water District tor connecting provisions for ihis building's water and <br /> sewer services. <br /> 22. A catch basin as per City Standard Pla�iW02 with a gas trap per Standaro Plan iW10 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, lhe pressure line must discharge into a private manhole, then <br /> gravity ilow across ihe public right-of-way. <br /> 24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> i��a <br /> PWCpnmenb I Rev:sed 61B111 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.