My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2510 BAKER AVE 2018-01-02 MF Import
>
Address Records
>
BAKER AVE
>
2510
>
2510 BAKER AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2022 2:32:11 PM
Creation date
1/23/2017 11:39:21 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2510
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> . <br /> : <br /> �lBL/C f�f/O/�JCS <br /> July 21, 1997 <br /> Puget Sound Development <br /> 1029 Grand Avenue <br /> Everett WA 98201 <br /> RE: Owner: Torgeson <br /> Job Address: 2510 Baicer <br /> Plan Check N:55933 - <br /> Dear Mr. Davenport: <br /> In response to your application for a construction permit, your plans have been examined <br /> and you are adv�sed that the issuance of a permit is being withheld for the reasons liste�l <br /> below. These comments address building issues only, additional revisions or additions <br /> may be required by other departments (such as Utilities, Planning or Firc). All <br /> references refer to the 1994 Uniform Building Code, as amendeci by the State of <br /> Washington and/or Washington State Energy Code 1995 Edition, unless stated <br /> otherwise. <br /> In order for the processing of yaur applicAtion to continue, it will be necessury to <br /> provide the Buil�ing Division with two complete new sets of drawings rcllecting the <br /> corrections requested. <br /> I. Plans do not provide sufficiei�t information on how roof structures is constructed. <br /> Specify size, species, grade and spacing of all framing members. Provide detail of <br /> bolted connection. Specify number and location of bolts. <br /> 2. Specify footing size and type. <br /> 3. Provide dimensions of all posi locations. <br /> 4. Trusses are required to be supported at specific bearing points. Specify length of <br /> trusses (outside of bearing to outside of bearin�;). <br /> 5. Provide design to address wind and seismic loading. <br /> UPon resubmital of the drawings, your application will be given priority and plan review <br /> will cammence. <br /> All required submitlals shall be of sufficient detail and conulin sufficient information to <br /> ensure that the proposed structure; will be constructed in compliance with all a�!�:pted <br /> ccxies. <br /> Sincerely, <br /> �i���.t.l1 - <br /> Jeff Heilman <br /> Development Technician <br /> �t�:ia:sno� <br /> CITY UF EVERETT• 3200 Cedar Street • EveretL WA 98201 •(425)257-8800 • Fax (425) 257•P.956 <br />
The URL can be used to link to this page
Your browser does not support the video tag.