My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
201 BARBARA LN 2016-01-01 MF Import
>
Address Records
>
BARBARA LN
>
201
>
201 BARBARA LN 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:08:21 PM
Creation date
1/23/2017 12:07:56 PM
Metadata
Fields
Template:
Address Document
Street Name
BARBARA LN
Street Number
201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORK ORDERS REPORT 'J <br /> Total Utility Maintenance Management System <br /> 05/08/1995 Paqe 1 <br /> ________________________________________________________________________________ <br /> Date Range : O1/09/1989 - 04/30/1995 . <br /> lM Work Order Range : 1001091070001 - 8801086100085Pattern : 7401196751231 <br /> Item Range :<Blank> - WW2202000?. Patt-ern : * <br /> Program ALL Function ALL Activity ALL <br /> _______________________________________________________________________________ <br /> CM WORK ORDER ID: 7401156751231 Title: CONVERT 201 BARBAF2A LANE <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS1284R046 -- WATER SERVICE <br /> Location ID: -- <br /> Program 740 Function 119 Activity 675 <br /> Date Complete�: 04/25/1995 <br /> Overall Craft: <br /> lssued: Gy/2.1;1?95 Issued by: SKL Assigned to: <br /> Out of Ser��ice? NO Yrior?rv: Travel Time: 0. 00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> Status� <br /> Labor: <br /> Craft ID Name Planned Hrs Actual flrs Cost <br /> ------ ------------------------------ ----------- ---------- ---------� <br /> UL SSJ SMITH, STEVE J. 0. 00 4 . 00 60. 1� <br /> WST WDT WALDEN, DAROLD T. 0. 00 4 . 00 80. 32 <br /> Total Labor Cost: 140 44 <br /> Materials: <br /> ID Description Date R Used Cost <br /> --------- -----------------------•------- -------- -------- <br /> ADAP34145347 ADAPTER 3/4"MIP X 1"IPS INSTA@ O4/25/1995 1 9 80 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 04/25/1995 1 12.27 <br /> ELL034101447 ELL 3/4" 90 DEG BRASS " 04/25/1995 1 1.7.8 <br /> MGTE36089447 METER 5/8" X 3/4" NEPTUNE T-10 04/25/1995 1 27, 9p <br /> NIPP34131247 NIPPLE 3/4" CLOSE BRASS ' 04/25/1995 1 0.75 <br /> NIPP34131747 NIPPLE 3/4" X 2 ]j2" BA�SS " 04/25/1995 1 1. 16 <br /> SETT34033647 SETTER COP 5/8" X 3/4" LGTH15" 04/25/1995 1 40.96 <br /> Totul Material Cost: 44 12 <br /> Vehicles: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2117 91 CHEV 1-TON HYD *JNIT 4 . 00 22. 40 <br /> Total Vehicle Cost: 22, 40 <br /> Work Description: <br /> ---------------------------------------------- --------------------------------- <br /> METER# 40304282 <br /> Total cost for work urder 740119G751231 : 256.9G <br />
The URL can be used to link to this page
Your browser does not support the video tag.