My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
211 BARBARA LN 2016-01-01 MF Import
>
Address Records
>
BARBARA LN
>
211
>
211 BARBARA LN 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:08:56 PM
Creation date
1/23/2017 12:08:40 PM
Metadata
Fields
Template:
Address Document
Street Name
BARBARA LN
Street Number
211
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public�Norks approved plan dated <br /> � Connect side sewer pe;City Standard tt601. <br /> J <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> �8. � Connect rooftop downspouts to the drainage system provided for this !ot. <br /> 9. Rooftop runofi must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachmer�t for more details. <br /> 10. The contractor must meet with the Fublic Works Inspector to discuss potential drainage <br /> routing prior to beginning lhe project. <br /> 11. Install erosion control measures as delermined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards (or small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this buiiding lut. <br /> 15. Remove and replace curr, gutter and sidewaik as per City of Everett Standard Plan #'s 305A <br /> E� 306 on this aroposal's 'rontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any brokei or damaged area must be r�placed). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18 Contact the Water District (or connecting provisions for this building's <br /> water and sewer services. <br /> 19 A catch basin as per City Standard Plan �102 with a gas lrap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to he installed, the pressure line must discharge into a private <br /> manhole, then gravity ilow across the public right-of-way. <br /> <� A spnnkler system is required for this building in com;,liance with the requiremenls of NFDA <br /> Standards 13D <br /> , � �/a <br />
The URL can be used to link to this page
Your browser does not support the video tag.