Laserfiche WebLink
PUBLIC WORKS PERMIT CnMMENTS <br /> 4. As per Public Works approved plan dated <br /> � Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per Ciry Standard #'s R01, 602, 604. <br /> 7. Connect all roo(top downspouts tc• !he side sewer. <br /> �8,! Connect roeftop downspouts to th�a drainage system provided for this lut. <br /> 9. Rooftop runoff must be dischargec ;c a roof downspout infiltration system per Ciry of Everett <br /> Storm Manual 3-2.6.2. The a;�proxirnate size trench is 3.5'wide, 2' deep and 25' long. See <br /> attachment for more detail;. <br /> 10. The contrscior must meet with th-� Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the pro;ect. <br /> 11. Install erosion control measures as oetermined by the Public Works insp�ctor, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Instali erosion con!rol measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion cf the aroject prior to final approval o(ihe <br /> permil. <br /> 14. All excavated material (rom foundation, sidewalk and driveways shail be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building tot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> 8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway irom the front �roperty line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and �ewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for tne parking arsa. <br /> � 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity ilow across the public right-of-way. <br /> � A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Slandards 13D. <br /> c:tc.mrt•e�u �/ <br /> I� <br />