My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
221 BARBARA LN 2016-01-01 MF Import
>
Address Records
>
BARBARA LN
>
221
>
221 BARBARA LN 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:09:47 PM
Creation date
1/23/2017 12:09:25 PM
Metadata
Fields
Template:
Address Document
Street Name
BARBARA LN
Street Number
221
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> REPAIR SPECIF ?.TZONS A:1D LIST OP WORFC BE BID <br /> Page Z of 6 <br /> Address: 2z1 Barbara Lane <br /> r <br /> 1. Roof s Guttera Teaz off existing roofing over rear <br /> porc and replace rotted sheathing and other atructural <br /> membets as per Item t3. Inatall new plywood �aheathing <br /> (1/2" CDX) , and 15# felt before new roofing. <br /> Scrape and power wash all moes from exieting roof. �� <br /> Remove existing guttera and downapouta. Femove <br /> bergeboard from overlapping section of roof. Inatall <br /> new metal flashing to seal area between two aectione of ` <br /> roof. Replace barqeboacd with new material. Inatall <br /> metal dxip edge, on rake edqes. Install new 235i <br /> aephalt compoeition ahingle roofing over exiatinq <br /> roofing includinq north closet addition, in accordance <br /> with manufacturer's installation inatructione. Inetall <br /> eelvage edge roll coofing over front and reer pocch <br /> roofs to match new ahingle roofing. Owner choice of <br /> color. <br /> Ine[all new continuous aluminum qutters, 5" 'R' atyle, <br /> owner choice of color, with matching downepouta. <br /> Replace facia complete before inatallinq new gutters. <br /> Scab on new rafter taila to extend soffit at roof eave <br /> edge on eouth side, east end, so that rafter tails are <br /> fluah with facia. Inatall guttera to dcain to <br /> downapouta. 3ecure guttera 48" O.C. to rafter tails. <br /> Secure downpouta top and bottom. Seal guttera <br /> ' complete. Provide new precast concrete aplashbiocks at <br /> all downepouta. <br /> _ S ISOO , 00 <br /> 2. Exterior Walls Tear off existing soffits e:cce t from <br /> ront porc weat to west end of houae and from weat end <br /> of north aide to rear porch, and replace with new 3/8" <br /> 303 . plywood, exterior glue. Fill all holes in exiating <br /> soffit. Replace any misaing siding. Replace warped <br /> aiding on baak porch. <br /> Inatall two wood bracketa on each aide of rake on east <br /> end of houae. Bracketa : 2 x 4 material, one chord <br /> nailed to aheathinq under aiding, (notch out eiding to <br /> fit) one chord nailed to soffit, (ceplace bargeboard and <br /> notch for bracket) and a third membec to run diaqonaily <br /> from bottom of wall chord to outaide of aoffit chord;' <br /> mitered to fit. <br /> Cut rotten wood off base of front porch support posts, <br /> inatall metal bracketa, anchored into concrete pad, and <br /> attached to existing posta. <br /> Repair foundation vents, replacinq any missing screens. <br /> Power wash aiding complete and scrape all loose and <br /> peeling paint. Patch sidinq as neceasary over opening <br /> for window to be removed. Prime all bare and new wood <br /> with one coat oil base primer. Caulk all openinga at <br /> material junctuces with paintable caulking. Owner wi11 <br /> , paint. � � <br /> S (o DO , o 0 <br /> 3. Rear Porch Remove rubble portion of foundation <br /> complete and install new block foundation over new <br /> concrete footings at northwest corner of rear porch . <br /> L Footings , reinforcing and anchoring : to ccde. <br />
The URL can be used to link to this page
Your browser does not support the video tag.