My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4719 BELVEDERE AVE 2016-01-01 MF Import
>
Address Records
>
BELVEDERE AVE
>
4719
>
4719 BELVEDERE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 10:17:16 AM
Creation date
1/23/2017 12:42:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BELVEDERE AVE
Street Number
4719
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
computed by the Public Works DeparUnent per the ordinance in effect at the time and <br />according to the information on the approved plans at the time of building permit issuance. <br />5. On-site detention is required, or in lieu of praviding on-site detention, if the downstream stortn <br />water systems have the capacity to handle the additional runoff then payment to City Drainage <br />Fund 340 is allowed. <br />6. Approval of construction plans will require demonstration that all pertinent standards and <br />regulations are met. <br />7. Ciry sveets and aileys are to be kept clear of din and debris at aii times during construction. <br />Dust suppression and sveet cleaning must occur as directed by the Public Works Inspector. <br />8. All exposed ground must be reseecied wnthin 30 days of the completion of conswction. If <br />reseeding is not practical due lo wealher or seasonal problems, the ground must be covered <br />with mulch as directcd by the Ciry Enginr.er. <br />9. Temporary erosion control measures for conswction activity must be operational prior to <br />commencement of any clearing or earthwork. <br />10. This proposal must adhere to the geotechnical engincering study prepaireci by Liu & <br />Associates. <br />1 l. Construction T�lans for tliis huildin�, must take intn consideration the information provided by <br />thc gcotcchnical study. <br />12. Adherance to the city building code and a building permit is required. <br />13. All collecteci surface water musl be conveyed by pipe to a slable discharge location at lhe <br />bottom of thc slape. <br />Fire Depnrtmenl requirements <br />Rick Robinson (42�257-8123 <br />1. Access to the swcture on this lot will be excessive. This may be mitigated by Uie installation <br />of a residential sprinkler system in compliance with the requiremenls of NFPA Standard 13D. <br />Plans for such a system shall be submitted to the Building Department and the Fire Department <br />for review and approval prior to commencement of construction. A final "in the bucket" and <br />alarm bell test, wimcsscd by a fire inspectot, will be perfonned prior to acceptance of the <br />system. Call (425) 257-8123 for more information. <br />2. Pire Suonression (Sprinkler) S�stem - An approved automatic suppression system shall be <br />prmided as reyuired by City Ordinance No. 1902-92, Chapter 16.76, of d�e Gvere[t Municipal <br />Cocle. The system must include a mechanicel weter gong bell. <br />Plans for any such syslem shall be submitteci to the BuilJing Department for examination and <br />approval. Such plans shall include plans for the underground mains that will supply thc <br />sprinkler systcm. <br />The type of sprinklcr to he installyd will be determinul by tLe Building Official. It may be an I <br />NFPA 13, NFPA 13R, or NFPA 13ll system depending uExm several factors. Sprinkler <br />` �' I � <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.