Laserfiche WebLink
PUBI.IL WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />� 6. � Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to ihe side sewer. <br />� 8� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff mu:tt be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />The contractor must meet with the Public VVorks Inspector to discuss potenlial dr2inage <br />routing prior to beginning lhe pmject. <br />Install erosion control measures as determineu by the Public Works insuec;or, such �s sdf <br />fence, straw bales, swales, or erosion blankets <br />Install erosion control measures per City of Evcrr�tt Siandards for sr��il parce-ls <br />Remove erosion control measures upon completior of the project prior to fnal approvcal ot fhe <br />permit. <br />14. All excavated material ,+rom foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15 Remove and replace curb, gutter and sidewalk as per City o( Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />dri�ieways and any broken or damaged area must be replaced). <br />?u <br />17 <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the (ront property line oul to the street paving. <br />1 b. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19 <br />2G <br />21 <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across lhe public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D <br />_.. _ �.. ��Z <br />