Laserfiche WebLink
Subsurfact Ecpforalion, Geologic HaZara, and <br />Urhrdere I.nts Ensr Preliminary Geotethnica! Engineering Repott <br />flerc« Rnshin�tan Projer� and Site Conditioru <br />L PROJECT ANll SITE CONDITIONS <br />1.0 INTRODUCTION <br />This report presents the results of our subsurface exploration, geologic hazard, and preliminary <br />geotechnical engineering smdy for che subject project. Our recommendations are preliminary <br />in that definite building locations and construction details ha�• � not been final!ied at the time of <br />this report. The location of the subject site is shown the Vicinity Map, Figure 1. The building <br />lot boundaries, existing site topography, and the approximate loc:ations of the explorations <br />accom�:lished for this study are presented �n the Site and Exploration Plan, Figure 2. In the <br />event that any changes in the nature, design, or locations of the swctures are platmed, the <br />conclusions and recommendations contained in this report should be reviewed and modified, or <br />verified, as necessary. <br />i.l I'urpose and Scone <br />The purpose of this smdy ti�as to provide geotechnical design recommendations to be used in <br />the preliminary design and development of the subject project. Our smdy included a review of <br />available geologic literature, cxcaeation of exploration pits, drilling exploration borings, and <br />performing geologic studies to assess the [ype, thic}:ness, distribution, and physical properties <br />of the subsurface sediments and shallow ground water conditions. Geologic hazard e��aluations <br />and geotechnical engineering studies were also conducted to assess suitable hazard mitieation <br />options, the types of suitable foundations, allo�aable foundation soil bearing pressures, piling <br />recommendations, anticipatr.d setQemrnts, basemendretaining wall lateral pressures, floor <br />support recommendations, and drainage considerations. This report summarizes our current <br />ficld�vork and offers development recommendations based on our present understanding of the <br />rrojcct. <br />1.2 Authorization <br />�4'ritten autliorization to procecd with this study u�as gran[ed ��� <br />Belvedere, LLC. Our cwdy was accomplished in general accordance w�4� our scope of work <br />letters dated June 13, 2003 and 7uly 31, 2003. This report has been prepared for the exclusive <br />usc of Dch�edere, LLC and their agents, for sPecific application to this project. Within the <br />limitations of scope, schedule, and budget, our scrvices have been performed in accordance <br />�cith generally accep[ed geotechnical engineerine and engineering geology practices in effectin <br />this arca at the time our report H�as prepared. IJo other H�arranry, express or implied, is made. <br />It must he understood that no recommendations or engineering design can yield a guarantee of <br />stable slopes Our'6b"�EP�9timret��inn8s..,�(?xoninion� 5 3��Ca�c �n_�t1?n�i�j/--..�►-���� <br />i nherenirr'i3��fiiixthenwnCtrs <br />,1larrh 5, _iXU ASSOCIATED E.1RTH SCIEh'CES, INC. <br />,�,.i ni,,�,ua� r,,,,.:�,.sr,tii��:c�«�r x,e Page 1 <br />