My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4809 BELVEDERE AVE 2016-01-01 MF Import
>
Address Records
>
BELVEDERE AVE
>
4809
>
4809 BELVEDERE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 2:06:29 PM
Creation date
1/23/2017 12:45:10 PM
Metadata
Fields
Template:
Address Document
Street Name
BELVEDERE AVE
Street Number
4809
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nugust 18. 2004 <br />Mr. Jim Thomas <br />fScl�-cdcrc Lols 32 anJ _lJ <br />L&A Job No. 4A088 <br />Pagc 9 <br />b�nks, if required, should nut he slecper than 2-I/21I: I V. Thc soils and tlte slability of cut slopes <br />should bc obscrvcd and vcrilicd by a g�otcchnical cnginccr during cxcavation. <br />Pcnnancnt lill cmb.inkincnts rcyuircd lu suprorl stiuctural or traflic loads shoul� bc conslrucicJ <br />with compacicd structural fill placcd ovcr prooGrollcd undisturbcd, n�tive, vcry stiff lo hard silt <br />or dense Gsperance Sand deposits afler the sur�icial unsuitable soils are strippcd. Permancnt fill <br />to be placed on slopes steeper than IS% grade should be relaincd structurally. Sloping ground <br />over which fill is to be placed should be bcnched wilh vcrtical steps no more Ihan 4 fecl high <br />:ilier stripping ul unsuitablc surficial sails. Thc slopc of permancnt fill cmbankmcnl should nol <br />be steeper Uian 211:1 V. llpon completion, the sloping face of permancnt fill embanl:ments <br />should bc thoroughly compacted ro a non-�•iclding statc with a hoc-pack. <br />I hc abovc rccommcnded cut and f711 slopes are undcr the assumption that groundwater secpagc <br />will not be encountered during construction. If groundwater seepage is encountered, the <br />construction sho�ld bc immcdiately haltcd and the slope stabilily re-evaluateJ. The slopes may <br />have to be Ilauened and other mcasures laken to stabilizc the slopcs. Sur(ace runoff should not <br />bc allowcd to Iluw uncontrollcd ovcr thc �cip of cul or fill slopcs. Pcrmancnl cut slopes or lill <br />cmb.mkmcnts shouW be sceded and cegetated as soon as possible for erosion prolec�ion and <br />lang-tenn slabilily, and should bc covcrcd with plastic shccls, as requircd, to protcct lhcm from <br />ciusiun by stornnvatcr imlil Ihc �cgrt.uion is fully c::tahlis6cd. <br />ti'I'RU<"1'UItAI, I�Ii.I, <br />Structural lill is Ihc lill placeJ undcr roadway pavcmcnts, footings, slabs-on-gradc, and bchind <br />rctaining walls where it suppoil loads. Structural fill should consist ofclean soils Gee o(organic <br />and other delcicrious suhstances and with pariicles nol larger Ihan four inches. Struclural fill <br />shuuld hare a moisturc cnntent within onc percent of its optimwn moisture content al the time of <br />LIU & ASSOCIAT�S, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.