My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6107 BERKSHIRE DR 2018-01-02 MF Import
>
Address Records
>
BERKSHIRE DR
>
6107
>
6107 BERKSHIRE DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 9:32:25 AM
Creation date
1/23/2017 12:48:29 PM
Metadata
Fields
Template:
Address Document
Street Name
BERKSHIRE DR
Street Number
6107
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oe'rM'f 135k?l <br />ADaPT Engineering, Inc. <br />800 Maynard Avenue South, Suite 403 <br />Seattle, Washington 98134 <br />Tel(206) 654-7045 <br />Fax (206) 654-7048 <br />April I, 1998 <br />ADaPT Job No. W 198-992 <br />Western Wireless Corporation <br />3650 - 131" Ave-tue Southeast, Suite 400 <br />Bellevue, Washington 98008 <br />Attention: Mr. Nathan Pierce <br />Subject: Geotechnical Engineering Evaluation <br />Everett 130' Mono <br />WW PCS SE-1603A <br />6107 Berkshire Drive <br />Everett, Washington <br />Dear Mr. Pierce: <br />Pursuant to your request, ADaPT Engineering, In-.. (ADaPT) is pleased to submit this report <br />describing our recent geotechnical engineering evaluation for the above. referenced site. The <br />purpose of this study was to interpret general surface and subsurface site conditions, from <br />which we could evaluate the feasibility of the project and formulate design recommendations <br />concerning site preparation, equipment pad and tower foundations, structural fill, and other <br />considerations. Our scope of seivices consisted of a surface reconnaissance, a subsurface <br />exploration., geotechnical analyses, and report preparation. Verbal authorization to proceed <br />with our study was given by Mr. Nathan Pierce of Westem Wireless Corp. on March 26, <br />1998. This report has been prepared for the exclusive use of Western Wireless Corporation, <br />and their agents, for specific application to this project in accordance with generally accepted <br />geotechnical engineering practice. P, a are in the process of completing an environmental site <br />assessment study for this site and the findings will be reported under separate cover. <br />
The URL can be used to link to this page
Your browser does not support the video tag.