My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6107 BERKSHIRE DR 2018-01-02 MF Import
>
Address Records
>
BERKSHIRE DR
>
6107
>
6107 BERKSHIRE DR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2021 9:32:25 AM
Creation date
1/23/2017 12:48:29 PM
Metadata
Fields
Template:
Address Document
Street Name
BERKSHIRE DR
Street Number
6107
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADEPT Engineering, Inc. <br />Western Wireless Corporation <br />ADaPT Job No, WA98-992 <br />April 1, 1998 <br />Page I <br />PROJECT DESCRIPTION <br />The host parcel is located on 6107 Berkshire Drive in Everett, Washington. The project site and <br />surrounding area are shown on the attached site vicinity map (Figure 1). It is cur understanding that <br />current development plans call for construction of a 130-foot tall monopole (Norm Atnericrn Pole) and <br />associated equipment building or cabinets. The attached Site and Exploration Plan (Figure 2) shows the <br />approximate location of the proposed cellular tower lease area in relation to other site features and the <br />fenced compound. <br />It should be emphasized that the conclusions and recommendations contained in this report are based on <br />our understanding of the currently proposed utilization of the project site, as derived from w,itten <br />information supplied to us by Western Wireless Corporation. Consequently, if any changes are made to <br />the project, we recommend that we review the changes and modify our recommcn(ati.)ns, if appropriate, <br />to reflect those changes. <br />EXPLORATORY METHODS <br />We explored surface and subsurface conditions at the project site on March 26, 1998. Our surface <br />exploration consisted of a visual site reconnaissance. Our subsurface exploration consisted of advancing <br />one soil test boring to a depth of approximatcl, 29 feet below the existing site grade. The location of the <br />boring, designated as I3-I, is shown on the attached Site and Exploration Plan (Figure 2). <br />The specific location and depth of the exploration performed was selected in relation to the proposed site <br />features, under the constraints of budget and site access. The location of the boring and other features <br />shown on Figure 2 were obtained by hand -taping from existing site features. As such, the exploration <br />location shown on Figure 2 should be considered accurate to the degree implied by the measuring <br />methods used. <br />Boring Aferhods <br />Boring B-I was advanced on March 26, 1998 using a truck mounted hollow-s :m auger drill rig. The <br />drill rig was operated by an independent company working under subcontract to ADaPT. A geotechnical <br />engineer from our firm continuously observed the boring, obtained representative soil samples, and <br />logged the subsurface conditions. Afler the boring was completed, the botchcle was backflllcd with a <br />mixture of soil cuttings and bentonite chips. <br />
The URL can be used to link to this page
Your browser does not support the video tag.