Laserfiche WebLink
ADaPTFnginaering, Inc. <br />Western Wireless Corporation <br />AMPT Job No, WA98 M <br />April 1, 1998 <br />Page 10 <br />will depend largely on proper initial site preparation, drainage. and construction procedures, monitoring <br />by experienced geotechnical personnel should be considered an integral part of the construction process. <br />We are available to provide geotechnical engineering services during the earthwork and foundation <br />construction phases of the project. If variations in the sutigrade conditi)ns are observed at that time, we <br />would be able to provide additional geotechnical recommendations, thu; minimizing delays as the project <br />develops. We are also available to review prehminary pleas and specifications before construction <br />begins, and to provide geotechnical inspection and testing services duri ig construction. <br />