Laserfiche WebLink
� <br />� <br />PUBLIC WORK� PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />� Connect side sewer per City Standard it601. <br />6. Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rookop downspouts to the drainage system provided for this lut. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Evereri <br />Storm Manual 3-2.6.2. Width ,�,, Depth z, Length 30: <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11 Install erosion control measures as determined by the Public Worlcs inspector, such as silt <br />fence, str�w bales, swales; or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />� Remove erosion control measures upon completion of the project prior to final approvai of the <br />permit. <br />14 •All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting ot material is allowed on this building lo�. <br />' 5. Remove and replace curb, gutter and sid=walk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's irontage as directed Ny the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area !nust be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17 Pave driveway from the front property line out to the street paving. <br />18. Contact the _ Wa?er District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Pian k410 is <br />required for the parking area. <br />20. If a sewer pump system �s tc be installed, the pressure line must discharge into a private <br />rr.anhole, then graviry flow across the public right-of-way. <br />21. A sprinkler system is rec,uired for this building in compliance with the requiremants of NFDA <br />Standards 13D. <br />PV1'CCmmenls �J„� <br />