Laserfiche WebLink
'velell INSPECTION REPORT <br />AddressQ(o_ <br />Contractor_aQP zV <br />Owner <br />Date <br />L�PPROVAL J PARTIAL APPROVAL <br />J VIOLATION J CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />J Please contact inspector and arrange for appointment. <br />J Was not able to perform inspection. <br />J CALL 259.8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />i <br />t <br />i <br />J Temp. Elect. J Framing J Gas Piping <br />J Footing J Drywall, Nailing J Consultation <br />J Foundation J Shear Nailing J Groundwork <br />J Ductwork J Grid J SVW. Slab <br />J Wood Stove J Rough -in UTInal <br />J Masonry J Service J Insulation <br />J/ByDG: Pmt. No. J MECH: Pmt. <br />Id ELEC: Pmt. No. _39/t � J PLBG: Pmt. <br />