Laserfiche WebLink
3 <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />03/30/1998 Page 1 <br />Date Range :01/09/1989 - 03/23/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196751396 <br />Item Range :<Blank> - WVL3694I:05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196751396 Title: REPAIR 6920 BEP,KSHIRE DR ✓ <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS0785B013 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 03/12/1998 <br />Overall Craft: <br />Issued: 03/12/1998 Issued by: WMW Assigned to: TDE1 <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name Planned Hrs Actual Hrs <br />-- ------ ------------------------- <br />-------------------------- <br />WST TDE1 THOMPSON, DWAYNE E. 0.00 4.00 <br />UL WTE WESTVANG, TERRY E. 0.00 4.00 <br />Materials: <br />ID <br />------------ <br />ADAP34000547 <br />BOXO00044947 <br />COUP36143547 <br />ELLO34101547 <br />Vehicles: <br />ID <br />---------- <br />VJ0026 <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX CURB 2 1/2" (LID ONLY) <br />COUPLING 1" CTN X 3/4" MIP @ <br />ELL 3/4" 45 DEG BRASS <br />Total Labor Cost: <br />Date # Us:.d <br />03/12/1998 2 <br />03/12/1998 1 <br />03/12/1998 1 <br />03/12/1998 1 <br />Total Material Cost <br />Description Hours <br />------------------- <br />------- ------ <br />197 FORD 1 TON SVC TRUCK 4.00 <br />Total Vehicle Cost: <br />Total cost for work order 7101196751396: <br />Cost <br />23.60 <br />23.60 <br />Cost <br />92.48 <br />64.80 <br />147.28 <br />Cost <br />16.84 <br />12.18 <br />4.82 <br />1.32 <br />35.16 <br />206.04 <br />