My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6214 BEVERLY BLVD 2016-01-01 MF Import
>
Address Records
>
BEVERLY BLVD
>
6214
>
6214 BEVERLY BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 4:50:00 PM
Creation date
1/23/2017 1:01:20 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
6214
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Total U*.ility MaintenanceWManagement System � <br />------- ---- 08/23/1994 _ Page 1 <br />---�----����_��_______�______ ----����_��_�____�_________________��_________ <br />Date Range :OS/O7/1992 - 08/17/1994 <br />CM Work Order Range :<Blank> - 8405423080229 Pattern :7401196750969 <br />Item Range :<Hlank> - WW22020001 <br />Program ALL Function ALL Activity ALL Pattern :* <br />es�aa�aaav���eav�eaaav a a-�'-- <br />CM WORK ORDER ID: 7401196750969 Title: REPAIR 6214 BEVERLY BLVD <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0685R056 -- WATER SERVICE <br />Location ID: __ <br />Program 7qp Function 119 <br />Date Completed: 08/04/1994 Activity 675 <br />Overall Craft: <br />Issued: 08/04/1994 <br />Out of Service7 No <br />Meter Readinq: <br />Downtime: 0 hours <br />Status: <br />Isbor: <br />CraPt ID <br />UL NSO <br />UL TDE1 <br />Vehicles: <br />ID <br />V2139-_----r <br />V2139 <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: O.pO Hr. <br />Name <br />-------------------- <br />NIELSEN, SCOTT O. <br />THOMPSON, DWAYNE £. <br />Uescription <br />SVC TRUCK CHEV 86 <br />SVC TRUCK CHEV 86 <br />Plan�ed Hrs <br />0.00 <br />0.00 <br />Work Description: <br />---------------------- <br />----------------•--••---- <br />INSTALL BOX FOR SIDEWALK JOB. <br />Totel cost for work order 7401196750969: <br />Actual Hrs <br />4.00 <br />4.00 <br />Total Labor Cost: <br />Date Hours <br />08� 04/1994 2 00 <br />08/O5/1994 2.00 <br />Total Vehicle Cost: <br />___Cost___ <br />5A.24 <br />57.40 <br />115.64 <br />Cost <br />10.20 <br />10.20 <br />20.40 <br />^---------------------------- <br />136.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.