My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6627 BEVERLY BLVD SITE DEV 2016-01-01 MF Import
>
Address Records
>
BEVERLY BLVD
>
6627
>
SITE DEV
>
6627 BEVERLY BLVD SITE DEV 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 2:01:48 PM
Creation date
1/23/2017 1:10:46 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
6627
Tenant Name
SITE DEV
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;i. an infillralion basin, I�SUllahlc soils rxist on thc sitc, <br />h. .i wctpond, <br />c. a conslructcd wctland, <br />d. a SMI Storm�iltcr (scc addilional critcria bclow). <br />1-3. All slormwatcr facilitics shall bc dcsigned in accordancc with City standards. <br />15. An casement will bc rcquircd for com�cyancc of stormwalcr runoff fram thc on-sitc stormwatcr <br />management facilitics to thc sto�m drainagc system in MaJison Strcet. <br />IG. Slvll Stormfiltcr: 7'hc Ciiy will allow thc usc of a Storm���.itcr Managcmcnt, Inc. (SMI) StormPiltcr <br />to mect thc Ciry's stonnwatcr trcatmcnt standards, provided thc dcsign and conswction of the SMI <br />Storm�iltcr mcet lhc follo���ing critcria: <br />;i. The Storinriltcr must bc prccedcd by a pretrcatment ���ctvaulUtank comaining at Ieast 30"Ir, of <br />thc 6-month, 24-hour storm runoff volumc from thc contributing, dcvclopcd drainagc .�rca. <br />h. Thc Stnrm�ihcr must trcat a� Icast thc 6-month, 24-hour slorm. <br />c. 'I�hc SlormPiltcr shall bc dcsigncd using a r.iaaimum (lo��� rale of 7.5 gpm per cartriJgc. <br />�lo���s excecding Ihe dcsign Flow shall be bypassed .�round the system, but should gcncrally <br />pass lhrough thc prctrcatmcnt wctvaulUtank. <br />d. 'I'hc StormFiltcr mcdia shull targct dissoh�cd po!lutants anJ nutricnls us �vell as total <br />suspcndcd solids. As morc effecti��c media bccomc availablc in thc fulure, the StormFiltcr <br />shall hc upgradcd, during routine cariridgc replacemenl, to Wilir.e thcsc improved mcdia. <br />c. Thc SrormPiltcr sh;dl bc dcsigncJ with a minimum of 2.3 fcct of hcad differential bctwccn thr <br />im�crts of thc inlet :md oullct of thc filtcr. Downstrcam hvdraulic calculations will bc <br />performcd to dcmonslratc that downstrcam conditions will not rcducc thc hydraulic putcnii:�l <br />across thc filtcr duc to hackw:�ter effcets. <br />I'. Routine maintcnancc of ihe Storm�iltcr is required. A dctailed operation and maintenancc <br />plan fur the system must be prepureJ for approval hy the City. �� ce�iificate of system <br />m.iintcnancc nu�sl bc suhmittcd io thc City annually. <br />g. Maintenance and upera�ion of Ihe StormFilter on this site shall be adapicd, in the future, to <br />reilect �he curcent kno�vlcdgc regarding this emerging technology. <br />h. All uthcr upplicablc, ;mJ non-con(licting, critcria in thc cwrent cdition of SMI's Product <br />Design Manu:il shall be follo��ed in the design, construction, ;md maintenance of lhe SMI <br />StormPiltcr on this sitc. <br />i. Par StormPihers locaicd do���nstrcam of detention sys�ems, thc SMI mass luading design <br />�iroccdure shall hc ulilir.ed, with thc follu���ing assumptions: <br />i. TSS rcmoval rcyuircd = SO°Ir� <br />ii. Vb = Ihc vulumc of dcad storagc plus thc 7-day aecragc li�c storagc ��olumc Irom thc <br />routing of Ihc G month,'_-1-hour slorm through thc dctcniion systcm (if a 7-day routing <br />is nut :i��:iilablc, usc Vb =��oluntc of dcad sioragcl <br />iii. Vr = thc 6 month. 2�1-hour storni volumc <br />iv. 1I = dcp�h of Vb <br />v. Mcan annual rainl.dl = 37 inchcs <br />vi. Pcrccnl runoff c.ipwrc = 90"r <br />�l� <br />
The URL can be used to link to this page
Your browser does not support the video tag.