My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6810 BEVERLY BLVD 2016-01-01 MF Import
>
Address Records
>
BEVERLY BLVD
>
6810
>
6810 BEVERLY BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 3:57:19 PM
Creation date
1/23/2017 1:19:05 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
6810
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />%�6. iConnect side sewer per City Standard �'s BOt, 602, 604. —�'—_-�"�""`°�''�' <br />l� <br />7. Connect all rooftop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm PAanual 3-2.6.2. Width _, Depth �, Length _. <br />10. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan n410 is <br />required for the parking area. <br />17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Werks Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced;. <br />12. Install a Type I concrete driveway per City of E•:�rett Standard #307. <br />13. Pa�e driveway from the front property line out to the street paving. <br />14. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then graviry flow across the public right-of-way. <br />16. The contractor must meet with the Public NJorks Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />18. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasiing of material is allowed on this building lot. <br />�-- <br />(' �`j . ! /`. %ji,�/T%;i�-/ !ri_'C'S�li✓ SC -� %�'�- -�-J"7i`% �d i✓ S//?t/lJ i S <br />'_ ._.. /��/�', /�� C'!�i✓_S�/'C C'7'!%'✓ s��- /t��cJ I✓-7/ i G= <br />;NST��CL ;il� /'-I`-.ic'e� �'lC�i� /_;i��c%� <br />-�-/l'�?L�l,_ �/C'.�� � <br />�wc;.mrams <br />�'i/>c-' Ot" <br />z�L <br />
The URL can be used to link to this page
Your browser does not support the video tag.