My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7006 BEVERLY BLVD 2016-01-01 MF Import
>
Address Records
>
BEVERLY BLVD
>
7006
>
7006 BEVERLY BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 12:35:46 PM
Creation date
1/23/2017 1:23:59 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7006
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC V1iORKS P�I�MIT' C014iM�P��"� i <br />4. As per Public Works approved plan dated . _ <br />5. Connect side sewer per Ciry Standard #60'I. <br />6. Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side se�ver. <br />� <br />(�/ Connect rooftop downspouts to the drainaye systerr arovided `or :ni � Ic�;. <br />�r�� <br />�Rooftop runoff must be dischar�ed to a roof d'�f,nspout infiltration svstem per Ciry oi Everett <br />Storm Manual 3-2.6.2. Width �, Depth _�_, Length �. <br />10. A catch basin as per City Standard Plan �t402 with a�as trap p2r Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewzf�c 3s per City of Everr.tt Stanjard Plan �r' , 3r,5a. <br />& 306 on this proposal's fron;a��e as directad by the Public Works Inspec:tor (i.e. sil �: iused <br />dr�veways and any broken o� d-emaged :srea must be replac�d). <br />12. Install a Type I concr�rte driveway nar City of Everett Standard a307. <br />13 Pave driveway from the frort propeRy Iine out to the street paving. <br />Water District for connectir.g provisions for this building's <br />14. Contact the "__ <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure i;ne must discharge into a privats <br />menhole, then graviry flow across the public ric�ht-uf-���ay. <br />16. The contractor must meet wi!h the Pubiic Works mspector to discuss potentral drainage <br />routing prior to beginning tha project. <br />17. A sprinkler system is required for this bui�ding in compliance with the requirements of NFDA <br />Standards 13D. , <br />f� ALL G—�Gv�V.�.-iz-2� �-l/kT7=� �,e�L F-c'n;y7 I�Ot)��e�f�T7cA <br />'�i�c��c'i-7LK; D���'t��u� ���C �3C H��JL�:�� io ��t-' <br />f3-��2GL'c�J �Ei2�7��,T—» �i� j�o �c.l-5Tr_-��UC� CF /%%�L�'//tL <br />� � -{-iu .3�,�t Jin,'l� �_�� . <br />pWCammenu <br />7 o v� f� ��-�j I'� � � 0 <br />L- 2-- <br />2� <br />
The URL can be used to link to this page
Your browser does not support the video tag.