Laserfiche WebLink
Date(s) of work: <br />Location of work: <br />�XCAVATION/TF2�NCHING SAFETY CHECKLIST <br />� ��– 9 � Work order �! /h � 35� <br />� <br />Is a"Competent Person", as defined in WAC 296-155-65Q, in chargc of job? .......................... Yes�, No � <br />:Ias Dial-A-Dig been called? ...................................................................................................... Yes� No� <br />Dial-A-Dig number ✓ Date & Time Dial-A-Dig Done ° <br />Are traffic control devices in place? <br />........................................................... Yes� No � <br />Is trench/evacuation on the toe of a hill, slope, or neaz a retaining wa;l? ................................... Yes � No� <br />(If yes, consult supervisor or engineer for recommendations.) <br />If trench/excavation is less than 4 feet deep aze sides stable? .............. <br />(If not, then trench/excavation must be shored.) <br />If trench is more than 4 feet deep is shoring in use7........ <br />......................... Yes� No � <br />...................... Yes � No� <br />Is shoring rated for depth of trench/exc�vation7 .................. .................................. Yes � No � <br />Is tabulated data for the shoring on the job site? ............................................................. Yes � No � <br />Are spoil piles and other material stored at lease 2 feet from the edge of the ........................... Yes j� No � <br />trench/excavation? <br />Is water removed from the bottom of the trench/excavation? ..................................................... Yes,� No � <br />Is a ladder available for entry/exit from trench/excavation?...... <br />Does it extend 3 feet above top of hench7 ............. <br />Is it secured at the top? ...................... .................... <br />Has it been inspected for defects/proi!ems today? <br />�, <br />............................ <br />........._._ ..� ........... <br />................................... <br />Yes � No � <br />Yes � No � <br />Yes � No � <br />Yes � No � <br />Is there a means of communication with rescuers in the event of an accident/problem?........... Yes� No � <br />, Are the open sides of the trench/excavation bamcaded, or protected, to prevent falls? ............. Yes � No � <br />Is there is a possibility of hazardous atmospheres in the trench/excavation7 ............................. Yes � No� <br />(Such as from leaking gas mains, nearby industries, work over landfills, or other situations.) <br />If yes, is a calibrated gas detector in use? ............................... ............................... Yes � No � <br />If yes, is a means of retrie��al available for workers in the trenchlexcavation? ..--�... Yes � No ❑ <br />Are all workers on site awaze of safety requirements for •���. r ers in trenches/excavations? ..... Yes�j No � <br />Signature of Crew Leader: „ � •• .. %i ,�Z� — llate:_ � � � � %S <br />.� <br />roaa�s.noroicKu���au�vs� • <br />