Laserfiche WebLink
.. � <br />� <br />., :�. <br />CITY OF EVERETT <br />DEPARTMENT OF PUBLIC WORKS <br />UTILITIES DIVISION <br />UTILITY WORK ORDER <br />Date: �� �WAfER -- <br />^ � <br />❑ SEWER <br />❑ STORM <br />Location: <br />W.Q.Instructions: <br />ESTIMATED <br />Labor (hours) . <br />Material (cost) . <br />Equipment (cost) : <br />,a v ,P, <br />C� SERVICE <br />� MAIN <br />O PUMP STATIUN <br />O TREATMEhT <br />❑ RESERVOIR <br />❑ VALVE <br />❑ MAN HOLE <br />❑ CATCH BASIN <br />❑ DITCH <br />��v �• <br />3S�e R U/C � <br />1'c�� �: (i �y i <br />W.O. No. _ <br />Acct No. �7� ��� <br />Complaint No. <br />❑ MAINTENANCE <br />O OPERATION <br />C!'`REPAIR <br />❑ CONSTRUCTION <br /><� �, <br />=-s� — <br />l 3-90 <br />ACTUAL <br />Cabor(hours) . <br />Material (cost) . <br />Equipment (cost) : <br />SCHEDULING REQUESTED <br />USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR TIME SLIPS. ITEMIZE <br />LABOR, EQUIPMENT, AND MATERIALS ON REVERSE SIDE. , <br />Completion (Date): � —� —� Cost:$ _ <br />iias • <br />Charge Account Number: <br />Charge Cost To (Name): <br />Address: ��p' <br />Invoice No.:_ AmountS Date: <br />