My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7525 BEVERLY BLVD 2016-01-01 MF Import
>
Address Records
>
BEVERLY BLVD
>
7525
>
7525 BEVERLY BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2017 8:07:35 AM
Creation date
1/23/2017 1:32:49 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 2, 1989 <br />Harold Anderson <br />7511 Beverly Blvd <br />Everett, WA 98203 <br />Job Address: 7525 Beverly Blvd <br />Pormit Number(s): 19866; A8301 <br />Date of Permit(s): APril 9, 198A <br />n�. rep„�n,.�..i <br />CI7Y OF <br />everett <br />PU84C WOHBSOEV�RTMENT <br />]ZOOCED�RSiREET <br />EVERETC WASHINGTON <br />9et01 <br />A review of our inspection rJe�oer 8s 1988 ls that the last inspection made at <br />the subject address was on <br />Section 30�(b) of the Uniform Building Code provides that permits expire by <br />limitation and become null and vo3d if the building or work authorized by <br />permit is susnended, aEter•the work is-commenced, for a period of 180 days. <br />The Code also requizes final inspection prior to occupancy for all permits <br />issued, and it is the responsibility of the permit holder to call for tha <br />necessary.insPections...Because.af .these kiiae.�rames,.your.permit has.already <br />expired. <br />However, the City of Everett is at this time extending a one-time grace <br />period to holders of recently expired permits. Zf you wish to recommence <br />work you may ranew your permit at no cost for an additional 180 day period <br />by submittzng a wriCten request to this office. The renewal requect must <br />zeach us by April 3,'19B9. Any corrections required must be completed and <br />final approval obtained before A�:ril 3rd. Permits that have been neither <br />finaled not renewed by that date wzll expire. To renew the work or obtain <br />.an inspection will then require the payment of a fee. <br />You may mail or deliver written requests to our office at 3200 Cedar Street, <br />Everett, WA 9ti201. If you have questions or �+ant to request an inspection, <br />plcase call us nt 259-8810, 8:00 AM to 5:00 PM, Pfonday through Friday. <br />Sfncerely, <br />ALFIiED R. T[iEAL� P.E. <br />Public Works Director <br />������ <br />gy: Marcaret McLeod <br />3uilding Department <br />STREETS PEALPFOFEHT'/ iMNSiT MOTOH BUROING PUELIL IItILITIES WNSiR11Gf�On ENGIHEERiNG TH�fFICENGA/ <br />WaierSewar 159�B800 259�9B00 <br />35Y-0lt0 LI.OS i59�660� VEHICLES Z59�B9U0 z598800 �59�BB00 INSFECTION 359�B800 SIGNALMeiNiENe <br />359�BB00 259�BB02 Drunaa� <br />
The URL can be used to link to this page
Your browser does not support the video tag.