Laserfiche WebLink
.i <br />CITY,OF EVERETT <br />DEPARTMENT OF PUBLIC WORKS <br />UTILITIES DIVISION <br />UTILITY WORK ORDER <br />W.O. No. c <br />Acct. No. <br />Complaint No. <br />Date: <br />�' / WATER ❑ <br />SERVICE <br />❑ MAINTENANCE <br />❑ SEWER ❑ <br />MAIN <br />❑ OPERATION <br />❑ STORM ❑ <br />PUMP STATION <br />❑ REPAIR <br />❑ <br />TREATMENT <br />2( CONSTRUCTION <br />❑ <br />RESERVOIR <br />❑ <br />VALVE <br />%ST-vlo4 <br />-ruMM S <br />❑ <br />MAN HOLE <br />❑ <br />CATCH BASIN <br />❑ <br />DITCH a <br />Location: <br />W.O. Instructions: FXCr�y� <br />ESTIMATED <br />ACTUAL <br />/9,,t-, ,/f/AGL <br />Labor (hours) Labor (hours) <br />Material (cost) Material (cost) <br />Equipment (cost) Equipment (cost) <br />SCHEDULING REQUESTED <br />USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR TIME SLIPS. ITEMIZE <br />LABOR, EQUIPMENT, AND MATERIALS ON REVERSE SIDE. <br />Completion (Date): ��— 3 �— Cost:S <br />Charge Account Number: Charge Cost To (Name): <br />Address: Zip: <br />Invoice No.: Amount:S Date: <br />1 +has <br />