Laserfiche WebLink
CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />05/08/1995 Page 1 <br />Date Range :O1/09/1989 - �4/30/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Yattern :"/4�1196751232 <br />? ��:: Range <br />:<Blank> - WW2202o001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />------------------- <br />CM WORK ORDER ZD: 7401196751232 Title: CONVERT 770k1 BEVERLY BLVD <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS0785R004 -- WATER SERVICE <br />Location IL: '- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 04/25/1995 <br />Overall Craft: <br />Issued: 04/21/1995 <br />out of Service? No <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL LMA <br />WST TDE1 <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000647 <br />BOX000065547 <br />COUP34003947 <br />COUP3A004347 <br />METE36089447 <br />PIPE340G0647 <br />VALV34008348 <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />LIBBING, MAURICE A. <br />THOMPSON, DWAYNE E. <br />Description <br />----------------------------- <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />nDAPTER 3/4" FIP X INSTA-TITE@ <br />BOY. METER CONC W/STEEL LID <br />COLIPLZNG 3/4" 1/4 BEND COPPER@ <br />CGUPLItdG 3/4" MIP X COP ELL @ <br />METER 5/R" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />VALVE METER 3/4" LOCK WING IP@ <br />Planned Hrs Actual Hrs <br />0.00 5.00 <br />0.00 5.00 <br />Total Labor Cost: <br />Date <br />04/25/1995 <br />04/25/1995 <br />04/25/1995 <br />04/25/1995 <br />04/25/1995 <br />04/25/1�95 <br />04/25/1995 <br />04/25/1995 <br />04/25/1995 <br />T Used <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />Total Material Cost: <br />Vehicles: <br />ID Description Hours Cost <br />------------ ------------------------------ ------ ---------- <br />V2146 87 CHEV 1 TON W/HYD. UNIT 5.00 25.50 <br />Total Vehicle Cost: 25.50 <br />�, <br />� <br />Cost <br />74.15 <br />81.75 <br />155.90 <br />Cost <br />---- 7.48 <br />15.18 <br />7.00 <br />28.15 <br />6.89 <br />3.78 <br />27.90 <br />0.24 <br />16.48 <br />113.10 <br />Work Description: <br />--------------------------------------------------------------------------- <br />METER'� 39594826 <br />n <br />