My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7903 BEVERLY BLVD 2018-01-02 MF Import
>
Address Records
>
BEVERLY BLVD
>
7903
>
7903 BEVERLY BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 9:01:46 AM
Creation date
1/23/2017 1:42:00 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7903
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET APR 2.4 2001 V <br />.......................................................... <br />/„ CITY OF EVERETT <br />,, <br />Receipt # 7(�/ ;'/J Engineering/Public Services <br />✓ Cost of Work Order 3,207.00 <br />Cost of Service Order <br />Contact Person Fran <br />Requested By Gordon Witcher <br />Property Owner (name) <br />Charge Cost to (name if different than owner) <br />Address 7904 Beverly Blvd <br />City Everett <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Everett, Washington 98101 <br />(425)257-8800 <br />Date Paid _-'4 2d2 -/Z_ <br />Work Order # <br />Service Order # <br />Telephone _,# <br />Date of Request <br />425 348-3102 <br />4-16-01 <br />Zip 98203 <br />Installation Location 7903 Beverly Blvd <br />Installation type/description/size/etc. Hydrant install for SP #1202-59-97. Expose 8' at corner of <br />Beverly/Leland. Make hot tap, install control valve pipe and hydrant. Restore area. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division IC working days in advance or required installation date to <br />allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS3'AND LARGER MAYHA tVEA SIX TO 10 WEEKLEAD TIME. <br />Material 1,633.00 <br />Laber and Benefits 1,080.00 <br />Equipment Rental 494.00 <br />TOTAL $3,207.00 <br />Prepared by: Gerr Cr Date Est. <br />Accepted by: Prepared: <br />4-17-01 <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Representin.: <br />L'uaN. T,u.,LN WIi _of <br />
The URL can be used to link to this page
Your browser does not support the video tag.