Laserfiche WebLink
3 <br />CLOSED CM WORE ORDERS REPORT <br />Total Utili'v Maintenance Management System <br />03/23/1998 Page 1 <br />a aaaa aaaaasacvvc avaaa=aeaan aaacav=aasa=ccaaaaaaacaacaaaaacvaacc�saaaaaaaaasaav <br />Date Range :01/09/1989 - 03/09/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196751.386 <br />Item Range :<Blank> - WVL3694LOS Pattern :+ <br />Program ALL Function ALL Activity ALL <br />aaav casaaaa aaaavaaaaaaavvaaaaaa aacaa aaaa aaaacaaa acaaaa vaa as aaa a aaavaaaaaaaaaac <br />04 WORK ORDER ID: 7101196751386 Title: CONVERT 7908 BEVERLY BLVD <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS0785S017 -- WAM. SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 03/03/1998 <br />overall Craft: <br />issued: 02/25/1998 Issued by: WNW Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name Planned Bra Actual Bra Cost <br />----- ------ ---------------------••-------- ----------- ---------- ---------- <br />UL CSG CAVANAH, SHAKE G. 0.00 6.50 94.32 <br />Total Labor Cost: 94.32 <br />Materials: <br />ID <br />Description <br />Date <br /># Used <br />cost <br />y <br />ADAP34000547 <br />ADAPTER 3/4" NIP R INSTA-TITE9 <br />03/02/1998 <br />2 <br />16.84 <br />BOX000065547 <br />BOX METER CONC W/STEEL LID <br />03/02/1998 <br />1 <br />44.94 <br />METE36089447 <br />METER 5/8" % 3/4" NEPTUNE T-10 <br />03/02/1996 <br />1 <br />30.67 <br />SET734146547 <br />SETTER COP 5/8" % 3/4" (H9") <br />03/02/1998 <br />1 <br />41.42 <br />Total Material Cost: <br />133.87 <br />vehicles: <br />ID <br />Description <br />Hours <br />------ ---------- <br />Cost <br />------------ <br />V2117 <br />------------------------------ <br />31 CHEV 1-TON HYD UNIT <br />6.00 <br />31.20 <br />Total Vehicle Cost: <br />31.20 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />NEW CONSTRUCTION <br />METER 241908469 <br />Total cost for work order 7101196751386: 259.39 <br />