Laserfiche WebLink
ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑Temp Service <br />❑ LIFER ground <br />❑ Groundwork/Slab <br />❑ GrjundworklSiab <br />❑ Groundwork <br />❑ Fooling <br />❑ Rough In <br />❑ Rough In <br />❑ SlablConduit <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ OK to Insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑ Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />_L?+rsulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Roof Nailing <br />❑ Rough IrdService <br />Hot Water Tank <br />❑ Footing drains <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Rough In <br />❑ Roof drains <br />❑ Building Final Gas PI a Final/l <br />HWTT <br />OTHER OR CONSULTATION: <br />---❑77l FFFFinal �7+/y <br />0 — ��L.L_ <br />❑ APPROVAL _ <br />❑ OK FOR T.C.O. RECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: _ <br />❑ CALL (425) 257-CS81 FOR REINSPECTION <br />FINAL APPROVAL THIS PERMIT <br />24 hour notice required <br />Inspector: <br />EIR (4l09) <br />