Laserfiche WebLink
everett <br />� <br />iNSPECTION REPORT <br />Address u ��� ���/ <br />Contractor _yc� tl x <br />Owner �a� �i /�1..0 r� <br />Date �'a —��l' <br />TYPE OFINSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: PmL No. <br />�LEC: Pmt. No. /i��0 ❑ PLdG <br />❑ Temp. Elect. ❑ Framin� <br />❑ Footing G Drywall, Nailing <br />❑ Foundation ❑ Shear Nailing <br />❑ Ductwork nd <br />❑ Wood Steve C Rough-In <br />❑ Masonry Servicc�R2�.� <br />Pmt. No. __ <br />❑ Gas Piping <br />❑ Consultation <br />❑ Groundwork <br />❑ Struct. Slab <br />❑ Final <br />❑ <br />L�PPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION FEQUIRED <br />❑ Corrections listed below NiUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-b810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR YO OCCUPANCY. <br />� <br />. 1: .r <br />Inspec�or � .Da�e ��,J�� <br />�--- <br />