Laserfiche WebLink
��� <br />J <br />CLOSED CM WORK ORDERS REPORT <br />City of Everett Total Utilit)� Maintenance Management S}�stem <br />— 09/21/1993 Page 1 <br />Date Range :11/09/1900 - 09/2'/1993_____________________________________________ <br />CM Work Order Ranqe :081080051000i - 8405421080229Pattern :7401196750659 <br />Item Fange :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />________________________________________________________________________________ <br />CM WORK ORD£R ID: 7401196�50659 Title: CONVERT 8125 BEVERLY &LVD <br />Item ID: WS0785S050 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 09/21/1993 <br />Overall Craft: <br />Issued: 09/09/1993 Issued by: ShL Assigned to: <br />Out of Service:' NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name __________Y Planned Hours Actual Hours Cost <br />--- ------ ------------------- ------------- ------------ --------- <br />UL LMA LIBBING, MAURICE A. 0.00 5.00 62.95 <br />WST WDT WALDEN, DAROLD T. 0.00 5.00 88.60 <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056:'.47 <br />COUP3400334% <br />ELL034101447 <br />METE36089447 <br />NIPP34131947 <br />PIPE34060647 <br />SETT34C33G47 <br />Veliicles: <br />ID <br />------------ <br />V2146 <br />Description <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTEk 3/4" FIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPI.ING 3/4" COMPRESSION @ <br />ELL 3/4" 90 DEG BRASS ' <br />METER 5/E" TRIDENT <br />NIPPLE 3/4" X 4" BRASS ' <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" LGTH15" <br />Date <br />09/14/1993 <br />09/14/1993 <br />09/14/1993 <br />09/14/1993 <br />09/14/1993 <br />09/14/1993 <br />09/14/1993 <br />09/14/1993 <br />05/14/1993 <br />Number <br />Used <br />1 <br />, 1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />Cost <br />7.75 <br />5.54 <br />12.00 <br />8.34 <br />1.97 <br />29.60 <br />3.02 <br />0.27 <br />45.36 <br />� 13, .� <br />Description Date Hours Cost <br />----------------------- -------- ------ --------- <br />SVC TRUCK CHEV 87 09/14/1993 5.00 28.00 <br />Total cost for work order 7401196750659 293 40 <br />